= Thursday July 15 =
 +
 +
=== Past 24 hours ===
 +
* Request for a Schedule Adjustment from Jul 27 to Aug 17 has been submitted.
 +
* Production on Full Pb target  (~0.5 B events)
 +
* [https://logbooks.jlab.org/entry/4014847 Install Empty Target] (12 pm)
 +
* Production on Empty Target  (~0.9 B events). Need about twice that. After checking statistics today, I suggest we stay on Empty Target, but run at 60 nA after maintenance.
 +
* [https://cebaf.jlab.org/dtm/open-events?event_id=16600 Storm Takes Down Accelerator]
 +
* Smooth, but trippy, beam after recovery. Trips are at about 15-20 trips/hr
 +
 +
=== Shift Reports ===
 +
* [https://logbooks.jlab.org/entry/4014893 Day shift summary] [https://logbooks.jlab.org/entry/4014831 Part II]
 +
* [https://logbooks.jlab.org/entry/4014931 Swing shift summary]
 +
* [https://logbooks.jlab.org/entry/4015049 Owl shift summary]
 +
* [https://logbooks.jlab.org/entry/4015132 Early Riser shift summary]
 +
 +
=== Reports ===
 +
* [https://logbooks.jlab.org/entry/4014959 Beam Strip Chart Swing]
 +
* [https://logbooks.jlab.org/entry/4014977 Suspicious FCAL Blocks]
 +
 +
=== Issues ===
 +
* We would like to add the TOF and CTOF trigger rates to EPICs/archiver
 +
 +
=== Plans ===
 +
* RF Recovery today (beam down 8.15 till ~5pm)
 +
* [https://logbooks.jlab.org/entry/4014889 HD Refrigerator Maintenance]
 +
* Access for Sasha and Vlad to install modules in PS Test Stand
 +
* Nick to work on DIRC environment
 +
* Following Maintenance: Plan to return to Full Pb Target and continue taking production data.
  
 
= Thursday July 14 =
 
= Thursday July 14 =
Line 38: Line 67:
 
* Access for Sasha and Vlad to install modules in PS Test Stand
 
* Access for Sasha and Vlad to install modules in PS Test Stand
 
* Nick to work on DIRC environment
 
* Nick to work on DIRC environment
* Following Maintenance: Plan to return to Full Pb Target and continue taking production data.
+
* Following Maintenance: Plan to continue with Empty Target data to complete the data taking cycle and then continue at 60 nA

Revision as of 09:58, 14 July 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Thursday July 15

Past 24 hours

  • Request for a Schedule Adjustment from Jul 27 to Aug 17 has been submitted.
  • Production on Full Pb target (~0.5 B events)
  • Install Empty Target (12 pm)
  • Production on Empty Target (~0.9 B events). Need about twice that. After checking statistics today, I suggest we stay on Empty Target, but run at 60 nA after maintenance.
  • Storm Takes Down Accelerator
  • Smooth, but trippy, beam after recovery. Trips are at about 15-20 trips/hr

Shift Reports

Reports

Issues

  • We would like to add the TOF and CTOF trigger rates to EPICs/archiver

Plans

  • RF Recovery today (beam down 8.15 till ~5pm)
  • HD Refrigerator Maintenance
  • Access for Sasha and Vlad to install modules in PS Test Stand
  • Nick to work on DIRC environment
  • Following Maintenance: Plan to return to Full Pb Target and continue taking production data.

Thursday July 14

Past 24 hours

  • Request for a Schedule Adjustment from Jul 27 to Aug 17 has been submitted.
  • Production on Full Pb target (~0.5 B events)
  • Install Empty Target (12 pm)
  • Production on Empty Target (~0.9 B events). Need about twice that. After checking statistics today, I suggest we stay on Empty Target, but run at 60 nA after maintenance.
  • Storm Takes Down Accelerator
  • Smooth, but trippy, beam after recovery. Trips are at about 15-20 trips/hr

Shift Reports

Reports

Issues

  • We would like to add the TOF and CTOF trigger rates to EPICs/archiver

Plans

  • RF Recovery today (beam down 8.15 till ~5pm)
  • HD Refrigerator Maintenance
  • Access for Sasha and Vlad to install modules in PS Test Stand
  • Nick to work on DIRC environment
  • Following Maintenance: Plan to continue with Empty Target data to complete the data taking cycle and then continue at 60 nA