Difference between revisions of "Run Planning Meeting Notes, July 14 - July 20, 2022"
From GlueXWiki
(→Thursday July 14) |
(→Thursday July 14) |
||
Line 22: | Line 22: | ||
* [https://logbooks.jlab.org/entry/4014931 Swing shift summary] | * [https://logbooks.jlab.org/entry/4014931 Swing shift summary] | ||
* [ Owl shift summary] | * [ Owl shift summary] | ||
− | * [ Early Riser shift summary] | + | * [https://logbooks.jlab.org/entry/4015132 Early Riser shift summary] |
=== Reports === | === Reports === |
Revision as of 06:56, 14 July 2022
Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Thursday July 14
Past 24 hours
- Production on Full Pb target (~0.5 B events)
- Install Empty Target (12 pm)
- Production on Empty Target (~xxxB events)
- Storm Takes Down Accelerator
Shift Reports
- Day shift summary Part II
- Swing shift summary
- [ Owl shift summary]
- Early Riser shift summary
Reports
Issues
- We would like to add the TOF and CTOF trigger rates to EPICs/archiver
Plans
- RF Recovery today (beam down 8.15 till ~5pm)
- HD Refrigerator Maintenance
- Access for Sasha and Vlad to install modules in PS Test Stand
- Following Maintenance: Plan to return to Full Pb Target and continue taking production data.