Line 16: | Line 16: | ||
* [https://logbooks.jlab.org/entry/4014847 Install Empty Target] (12 pm) | * [https://logbooks.jlab.org/entry/4014847 Install Empty Target] (12 pm) | ||
* Production on Empty Target (~xxxB events) | * Production on Empty Target (~xxxB events) | ||
+ | * [https://cebaf.jlab.org/dtm/open-events?event_id=16600 Storm Takes Down Accelerator] | ||
=== Shift Reports === | === Shift Reports === |
Revision as of 21:26, 13 July 2022
Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Thursday July 14
Past 24 hours
- Production on Full Pb target (~0.5 B events)
- Install Empty Target (12 pm)
- Production on Empty Target (~xxxB events)
- Storm Takes Down Accelerator
Shift Reports
- Day shift summary Part II
- Swing shift summary
- [ Owl shift summary]
- [ Early Riser shift summary]
Reports
Issues
- We would like to add the TOF and CTOF trigger rates to EPICs/archiver
Plans
- RF Recovery today (beam down 8.15 till ~5pm)
- HD Refrigerator Maintenance
- Access for Sasha and Vlad to install modules in PS Test Stand
- Following Maintenance: Plan to return to Full Pb Target and continue taking production data.