Difference between revisions of "Run Planning Meeting Notes, July 14 - July 20, 2022"
From GlueXWiki
(→Past 24 hours) |
|||
Line 9: | Line 9: | ||
[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs] | [https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs] | ||
+ | = Thursday July 15 = | ||
+ | |||
+ | === Past 24 hours === | ||
+ | * Request for a Schedule Adjustment from Jul 27 to Aug 17 has been submitted. | ||
+ | * Production on Full Pb target (~0.5 B events) | ||
+ | * [https://logbooks.jlab.org/entry/4014847 Install Empty Target] (12 pm) | ||
+ | * Production on Empty Target (~0.9 B events). Need about twice that. After checking statistics today, I suggest we stay on Empty Target, but run at 60 nA after maintenance. | ||
+ | * [https://cebaf.jlab.org/dtm/open-events?event_id=16600 Storm Takes Down Accelerator] | ||
+ | * Smooth, but trippy, beam after recovery. Trips are at about 15-20 trips/hr | ||
+ | |||
+ | === Shift Reports === | ||
+ | * [https://logbooks.jlab.org/entry/4014893 Day shift summary] [https://logbooks.jlab.org/entry/4014831 Part II] | ||
+ | * [https://logbooks.jlab.org/entry/4014931 Swing shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4015049 Owl shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4015132 Early Riser shift summary] | ||
+ | |||
+ | === Reports === | ||
+ | * [https://logbooks.jlab.org/entry/4014959 Beam Strip Chart Swing] | ||
+ | * [https://logbooks.jlab.org/entry/4014977 Suspicious FCAL Blocks] | ||
+ | |||
+ | === Issues === | ||
+ | * We would like to add the TOF and CTOF trigger rates to EPICs/archiver | ||
+ | |||
+ | === Plans === | ||
+ | * RF Recovery today (beam down 8.15 till ~5pm) | ||
+ | * [https://logbooks.jlab.org/entry/4014889 HD Refrigerator Maintenance] | ||
+ | * Access for Sasha and Vlad to install modules in PS Test Stand | ||
+ | * Nick to work on DIRC environment | ||
+ | * Following Maintenance: Plan to return to Full Pb Target and continue taking production data. | ||
= Thursday July 14 = | = Thursday July 14 = | ||
Line 38: | Line 67: | ||
* Access for Sasha and Vlad to install modules in PS Test Stand | * Access for Sasha and Vlad to install modules in PS Test Stand | ||
* Nick to work on DIRC environment | * Nick to work on DIRC environment | ||
− | * Following Maintenance: Plan to | + | * Following Maintenance: Plan to continue with Empty Target data to complete the data taking cycle and then continue at 60 nA |
Revision as of 09:58, 14 July 2022
Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Contents
Thursday July 15
Past 24 hours
- Request for a Schedule Adjustment from Jul 27 to Aug 17 has been submitted.
- Production on Full Pb target (~0.5 B events)
- Install Empty Target (12 pm)
- Production on Empty Target (~0.9 B events). Need about twice that. After checking statistics today, I suggest we stay on Empty Target, but run at 60 nA after maintenance.
- Storm Takes Down Accelerator
- Smooth, but trippy, beam after recovery. Trips are at about 15-20 trips/hr
Shift Reports
Reports
Issues
- We would like to add the TOF and CTOF trigger rates to EPICs/archiver
Plans
- RF Recovery today (beam down 8.15 till ~5pm)
- HD Refrigerator Maintenance
- Access for Sasha and Vlad to install modules in PS Test Stand
- Nick to work on DIRC environment
- Following Maintenance: Plan to return to Full Pb Target and continue taking production data.
Thursday July 14
Past 24 hours
- Request for a Schedule Adjustment from Jul 27 to Aug 17 has been submitted.
- Production on Full Pb target (~0.5 B events)
- Install Empty Target (12 pm)
- Production on Empty Target (~0.9 B events). Need about twice that. After checking statistics today, I suggest we stay on Empty Target, but run at 60 nA after maintenance.
- Storm Takes Down Accelerator
- Smooth, but trippy, beam after recovery. Trips are at about 15-20 trips/hr
Shift Reports
Reports
Issues
- We would like to add the TOF and CTOF trigger rates to EPICs/archiver
Plans
- RF Recovery today (beam down 8.15 till ~5pm)
- HD Refrigerator Maintenance
- Access for Sasha and Vlad to install modules in PS Test Stand
- Nick to work on DIRC environment
- Following Maintenance: Plan to continue with Empty Target data to complete the data taking cycle and then continue at 60 nA