Difference between revisions of "Run Planning Meeting Notes, January 26 - February 1, 2023"

From GlueXWiki
Jump to: navigation, search
m (Past 72 hours)
m
Line 117: Line 117:
 
* [https://logbooks.jlab.org/entry/4119769 FCAL voltage scan ]
 
* [https://logbooks.jlab.org/entry/4119769 FCAL voltage scan ]
  
<!--* Tagger rest box procedures (A. Somov) * Trigger fine tuning Sunday (A. Somov)-->
 
 
*GlueX Statistics  
 
*GlueX Statistics  
 
**PARA 0/90: 12%
 
**PARA 0/90: 12%
Line 128: Line 127:
 
* [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] The Start Counter is in the same physical position (2014 and 2019 pictures)
 
* [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] The Start Counter is in the same physical position (2014 and 2019 pictures)
 
* [https://logbooks.jlab.org/entry/4118950 TPOL channel 23 missing (Justin)] [https://logbooks.jlab.org/entry/4119302 TPOL occupancy hole (Hovanes)][http://meson.hldsite.com/presentations/TPOL/hardwareMay2022-V2.pdf TPOL Presentation (Michael Dugger)] We can check it on Wednesday during maintenance  
 
* [https://logbooks.jlab.org/entry/4118950 TPOL channel 23 missing (Justin)] [https://logbooks.jlab.org/entry/4119302 TPOL occupancy hole (Hovanes)][http://meson.hldsite.com/presentations/TPOL/hardwareMay2022-V2.pdf TPOL Presentation (Michael Dugger)] We can check it on Wednesday during maintenance  
* [https://logbooks.jlab.org/entry/4119306 TAGH HV crate problem again (Hovanes)] We have a spare.
+
* [https://logbooks.jlab.org/entry/4119306 TAGH HV crate problem again (Hovanes)]  
* [https://logbooks.jlab.org/entry/4119949 TAGH alarming channels: bad board ?  (Hovanes)]
+
* [https://logbooks.jlab.org/entry/4119949 TAGH alarming channels: bad board ?  (Hovanes)] We have a spare.
 
* [https://logbooks.jlab.org/entry/4119436 FCAL has new hot channels (Hovanes) ]
 
* [https://logbooks.jlab.org/entry/4119436 FCAL has new hot channels (Hovanes) ]
 
* [https://logbooks.jlab.org/entry/4119325  Missing TAGH FADC channels (Hovanes) ] (Probably on purpose)  
 
* [https://logbooks.jlab.org/entry/4119325  Missing TAGH FADC channels (Hovanes) ] (Probably on purpose)  
Line 144: Line 143:
 
**2 runs para(0/90)
 
**2 runs para(0/90)
 
**2 runs perp(0/90)
 
**2 runs perp(0/90)
**2 runs para(45/135)
+
**2 runs para(45/135) -> at least 1 extra run to catch up (~.6B triggers down) [corrected]
**2 runs perp(45/135) -> at least 1 extra run to catch up (~.6B triggers down)
+
**2 runs perp(45/135)
 +
**1 run amo (use it to rejuvenate amo reference in CBREM GUI)
 +
 
 +
= Tuesday January 31 =
 +
=== Past 24 hours ===
 +
* Production on diamond. ABU= xx h for the day.
 +
 
 +
=== Shift Reports ===
 +
* [https://logbooks.jlab.org/entry/4120317 Day shift summary]
 +
* [https://logbooks.jlab.org/entry/ Swing shift summary]
 +
* [https://logbooks.jlab.org/entry/ Owl shift summary]
 +
* [https://logbooks.jlab.org/entry/ Early Riser shift summary]
 +
 
 +
=== Reports ===
 +
* MCC is scheduling maintenance for Feb 1st
 +
* [https://logbooks.jlab.org/entry/4120510 TAGH HV crate power cycled (A. Somov)]
 +
* [https://logbooks.jlab.org/entry/4120459 FCAL HV alarms (Hovanes) ]
 +
<!--* Tagger rest box procedures (A. Somov) * Trigger fine tuning (A. Somov)-->
 +
 
 +
*GlueX Statistics
 +
**PARA 0/90: 12%
 +
**PERP 0/90: 15%
 +
**PARA 45/135: 14%
 +
**PERP 45/135: 12%
 +
**AMO : 44%
 +
 
 +
=== Issues ===
 +
* [https://logbooks.jlab.org/entry/4117764 Start Counter (Beni)] We want to confirm that the cables are in the right location. On Wednesday we can take a look at them.
 +
* [https://logbooks.jlab.org/entry/4118950 TPOL channel 23 missing (Justin)] [https://logbooks.jlab.org/entry/4119302 TPOL occupancy hole (Hovanes)][http://meson.hldsite.com/presentations/TPOL/hardwareMay2022-V2.pdf TPOL Presentation (Michael Dugger)] We can check it on Wednesday during maintenance
 +
* [https://logbooks.jlab.org/entry/4119949 TAGH alarming channels: bad board ?  (Hovanes)]We have a spare. It can be changed on Wednesday
 +
 
 +
* We might need to add a few extra runs for -45 trigs to catch up to the others
 +
 
 +
Pending:
 +
* BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.
 +
 
 +
=== Plans ===
 +
 
 +
* Production (300 nA, 2h runs) with cycle:
 +
**2 runs para(0/90)
 +
**2 runs perp(0/90)
 +
**2 runs para(45/135)-> at least 1 extra run to catch up (~.6B triggers down)
 +
**2 runs perp(45/135)  
 
**1 run amo (use it to rejuvenate amo reference in CBREM GUI)
 
**1 run amo (use it to rejuvenate amo reference in CBREM GUI)

Revision as of 16:49, 30 January 2023

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Thursday January 26

Past 24 hours

  • Production on diamond. ABU= 10 h for the day.

Shift Reports

Reports

Issues

Pending:

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)
  • Trigger fine tuning Thursday? (A. Somov)

Friday January 27

Past 24 hours

  • Production on diamond. ABU= 1.3 h for the day.

Shift Reports

Reports

Issues


Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Harp scan once beam returns. Then continue cycle.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)

Monday January 30

Past 72 hours

  • Production on diamond. ABU= 44.5 h for the weekend. (15.7 h Friday , 17.1 h Saturday, 11.7 Sunday)

Shift Reports Friday

Shift Reports Saturday

Shift Reports Sunday

Reports

  • GlueX Statistics
    • PARA 0/90: 12%
    • PERP 0/90: 15%
    • PARA 45/135: 14%
    • PERP 45/135: 12%
    • AMO : 44%

Issues

Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Opportunistic access to reset tagger (To be confirmed after morning meetings)
  • Harp scan after beam is restored
  • Sasha will perform trigger studies in the 10pm - 4am shift.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135) -> at least 1 extra run to catch up (~.6B triggers down) [corrected]
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)

Tuesday January 31

Past 24 hours

  • Production on diamond. ABU= xx h for the day.

Shift Reports

Reports

  • GlueX Statistics
    • PARA 0/90: 12%
    • PERP 0/90: 15%
    • PARA 45/135: 14%
    • PERP 45/135: 12%
    • AMO : 44%

Issues

  • We might need to add a few extra runs for -45 trigs to catch up to the others

Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)-> at least 1 extra run to catch up (~.6B triggers down)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)