Difference between revisions of "Run Planning Meeting Notes, January 26 - February 1, 2023"

From GlueXWiki
Jump to: navigation, search
m (Plans)
m (Issues)
Line 129: Line 129:
 
* [https://logbooks.jlab.org/entry/4118950 TPOL channel 23 missing (Justin)] [https://logbooks.jlab.org/entry/4119302 TPOL occupancy hole (Hovanes)][http://meson.hldsite.com/presentations/TPOL/hardwareMay2022-V2.pdf TPOL Presentation (Michael Dugger)] We can check it on Wednesday during maintenance  
 
* [https://logbooks.jlab.org/entry/4118950 TPOL channel 23 missing (Justin)] [https://logbooks.jlab.org/entry/4119302 TPOL occupancy hole (Hovanes)][http://meson.hldsite.com/presentations/TPOL/hardwareMay2022-V2.pdf TPOL Presentation (Michael Dugger)] We can check it on Wednesday during maintenance  
 
* [https://logbooks.jlab.org/entry/4119306 TAGH HV crate problem again (Hovanes)]
 
* [https://logbooks.jlab.org/entry/4119306 TAGH HV crate problem again (Hovanes)]
 +
* [https://logbooks.jlab.org/entry/4119949 TAGH alarming channels: bad board ?  (Hovanes)]
 
* [https://logbooks.jlab.org/entry/4119436 FCAL has new hot channels (Hovanes) ]
 
* [https://logbooks.jlab.org/entry/4119436 FCAL has new hot channels (Hovanes) ]
 
* [https://logbooks.jlab.org/entry/4119325  Missing TAGH FADC channels (Hovanes) ] (Probably on purpose)  
 
* [https://logbooks.jlab.org/entry/4119325  Missing TAGH FADC channels (Hovanes) ] (Probably on purpose)  

Revision as of 23:15, 29 January 2023

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Thursday January 26

Past 24 hours

  • Production on diamond. ABU= 10 h for the day.

Shift Reports

Reports

Issues

Pending:

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)
  • Trigger fine tuning Thursday? (A. Somov)

Friday January 27

Past 24 hours

  • Production on diamond. ABU= 1.3 h for the day.

Shift Reports

Reports

Issues


Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Harp scan once beam returns. Then continue cycle.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)

Monday January 30

Past 72 hours

  • Production on diamond. ABU= xx h for the day.

Shift Reports Friday

Shift Reports Saturday

Shift Reports Sunday

Reports

  • GlueX Statistics
    • PARA 0/90: x%
    • PERP 0/90: x%
    • PARA 45/135: x%
    • PERP 45/135: x%
    • AMO : x%

Issues

Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Opportunistic access to reset tagger (To be confirmed after morning meetings)
  • Harp scan after beam is restored
  • Sasha will perform trigger studies in the 10pm - 4am shift.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)