Difference between revisions of "Run Planning Meeting Notes, January 26 - February 1, 2023"

From GlueXWiki
Jump to: navigation, search
m (Reports)
m
Line 4: Line 4:
  
 
[https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=60671503 Spreadsheet with list of runs]
 
[https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=60671503 Spreadsheet with list of runs]
 +
 +
[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2023-01/index.html Integrated Trigger Count]
  
 
= Thursday January 26 =
 
= Thursday January 26 =

Revision as of 09:15, 27 January 2023

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Thursday January 26

Past 24 hours

  • Production on diamond. ABU= 10 h for the day.

Shift Reports

Reports

Issues

Pending:

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)
  • Trigger fine tuning Thursday? (A. Somov)

Friday January 27

Past 24 hours

  • Production on diamond. ABU= 1.3 h for the day.

Shift Reports

Reports

Issues


Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period. PD will keep in contact with us on how to proceed.

Plans

  • Harp scan once beam returns. Then continue cycle.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)