=== Reports ===
 
=== Reports ===
 
* MCC is scheduling maintenance for Feb 1st
 
* MCC is scheduling maintenance for Feb 1st
* [https://logbooks.jlab.org/entry/4117725 Barometric pressure alarm (Hovanes)].  
+
*[https://logbooks.jlab.org/entry/4117725 Barometric pressure alarm (Hovanes)].  
* Trigger fine tuning Sunday (A. Somov)
+
*[https://logbooks.jlab.org/entry/4117880 DIRC SiPM Update (Justin)] The inverter box was installed and it is working
 +
*[https://logbooks.jlab.org/entry/4118123 Harp Scan Results] Could we add procedures on how to judge the results for the extrapolation?
 
*[https://logbooks.jlab.org/entry/4117832 The left Ar gas supply bank is empty] The new supply will be swapped out today
 
*[https://logbooks.jlab.org/entry/4117832 The left Ar gas supply bank is empty] The new supply will be swapped out today
*[https://logbooks.jlab.org/entry/4117880 DIRC SiPM Update (Justin)] The inverter box was installed and working
+
* Trigger fine tuning Sunday (A. Somov)
 
<!--* Tagger rest box procedures (A. Somov)-->
 
<!--* Tagger rest box procedures (A. Somov)-->
  

Revision as of 07:53, 27 January 2023

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Thursday January 26

Past 24 hours

  • Production on diamond. ABU= 10 h for the day.

Shift Reports

Reports

Issues

Pending:

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)
  • Trigger fine tuning Thursday? (A. Somov)

Friday January 27

Past 24 hours

  • Production on diamond. ABU= xx h for the day.

Shift Reports

Reports

Issues


Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period.Talked to the PD, he will keep in contact with us on how to proceed.

Plans

  • Harp scan once beam returns. Then continue cycle.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)