Difference between revisions of "Run Planning Meeting Notes, January 26 - February 1, 2023"

From GlueXWiki
Jump to: navigation, search
m (Issues)
m (Issues)
Line 61: Line 61:
 
=== Issues ===
 
=== Issues ===
 
[https://logbooks.jlab.org/entry/4117764 Start Counter HV match test (Beni)] Given the results of this test, the next step is to figure out if there is a physical rotation on the counter.
 
[https://logbooks.jlab.org/entry/4117764 Start Counter HV match test (Beni)] Given the results of this test, the next step is to figure out if there is a physical rotation on the counter.
 +
 
<!--
 
<!--
 
* [https://logbooks.jlab.org/entry/4116427 DIRC LED TDC missing (David Lawrence, Justin)] [https://logbooks.jlab.org/entry/4117275 DIRC SiPM reference signal (Justin)]
 
* [https://logbooks.jlab.org/entry/4116427 DIRC LED TDC missing (David Lawrence, Justin)] [https://logbooks.jlab.org/entry/4117275 DIRC SiPM reference signal (Justin)]
 
**Tentative plan of action: Chris Stanislav will have a spare this afternoon and Justin will install during an opportunistic access
 
**Tentative plan of action: Chris Stanislav will have a spare this afternoon and Justin will install during an opportunistic access
 
-->
 
-->
 +
 
Pending:
 
Pending:
 
* BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period.Talked to the PD, he will keep in contact with us on how to proceed.
 
* BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period.Talked to the PD, he will keep in contact with us on how to proceed.

Revision as of 12:59, 26 January 2023

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Thursday January 26

Past 24 hours

  • Production on diamond. ABU= 10 h for the day.

Shift Reports

Reports

Issues

Pending:

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)
  • Trigger fine tuning Thursday? (A. Somov)

Friday January 27

Past 24 hours

  • Production on diamond. ABU= xx h for the day.

Shift Reports

Reports

Issues

Start Counter HV match test (Beni) Given the results of this test, the next step is to figure out if there is a physical rotation on the counter.


Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period.Talked to the PD, he will keep in contact with us on how to proceed.

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)