Difference between revisions of "Run Planning Meeting Notes, January 26 - February 1, 2023"

From GlueXWiki
Jump to: navigation, search
m (Issues)
Line 1: Line 1:
 +
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]
 +
 +
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]
 +
 +
[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs]
 +
 
= Thursday January 26 =
 
= Thursday January 26 =
 
=== Past 24 hours ===
 
=== Past 24 hours ===
Line 36: Line 42:
 
**1 run amo (use it to rejuvenate amo reference in CBREM GUI)
 
**1 run amo (use it to rejuvenate amo reference in CBREM GUI)
 
* Trigger fine tuning Thursday? (A. Somov)
 
* Trigger fine tuning Thursday? (A. Somov)
 +
 +
= Friday January 27 =
 +
=== Past 24 hours ===
 +
* Production on diamond. ABU= xx h for the day.
 +
 +
=== Shift Reports ===
 +
* [https://logbooks.jlab.org/entry/ Day shift summary]
 +
* [https://logbooks.jlab.org/entry/ Swing shift summary]
 +
* [https://logbooks.jlab.org/entry/ Owl shift summary]
 +
* [https://logbooks.jlab.org/entry/ Early Riser shift summary]
 +
 +
=== Reports ===
 +
* [https://logbooks.jlab.org/entry/ Barometric pressure alarm (Hovanes)].
 +
* MCC is scheduling maintenance for Feb 1st
 +
* Trigger fine tuning Sunday (A. Somov)
 +
<!--* Tagger rest box procedures (A. Somov)-->
 +
 +
=== Issues ===
 +
<!--
 +
* [https://logbooks.jlab.org/entry/4116334 Start counter 96 degree rotation in cabling or software space (Simon)].
 +
**Tentative plan of action: To turn off the low voltage to the SiPM bias for a few specific start counter paddles and take a 1-hour run where we can identify the physical location of these paddles using the tracking detectors.
 +
* [https://logbooks.jlab.org/entry/4116427 DIRC LED TDC missing (David Lawrence, Justin)] [https://logbooks.jlab.org/entry/4117275 DIRC SiPM reference signal (Justin)]
 +
**Tentative plan of action: Chris Stanislav will have a spare this afternoon and Justin will install during an opportunistic access
 +
-->
 +
Pending:
 +
* BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period.Talked to the PD, he will keep in contact with us on how to proceed.
 +
 +
=== Plans ===
 +
* Production (300 nA, 2h runs) with cycle:
 +
**2 runs para(0/90)
 +
**2 runs perp(0/90)
 +
**2 runs para(45/135)
 +
**2 runs perp(45/135)
 +
**1 run amo (use it to rejuvenate amo reference in CBREM GUI)

Revision as of 12:12, 26 January 2023

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Thursday January 26

Past 24 hours

  • Production on diamond. ABU= 10 h for the day.

Shift Reports

Reports

Issues

Pending:

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)
  • Trigger fine tuning Thursday? (A. Somov)

Friday January 27

Past 24 hours

  • Production on diamond. ABU= xx h for the day.

Shift Reports

Reports

Issues

Pending:

  • BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period.Talked to the PD, he will keep in contact with us on how to proceed.

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs para(0/90)
    • 2 runs perp(0/90)
    • 2 runs para(45/135)
    • 2 runs perp(45/135)
    • 1 run amo (use it to rejuvenate amo reference in CBREM GUI)