Difference between revisions of "Run Planning Meeting Notes, January 26 - February 1, 2023"
From GlueXWiki
m (→Issues) |
|||
Line 1: | Line 1: | ||
+ | [https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard] | ||
+ | |||
+ | [https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board] | ||
+ | |||
+ | [https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs] | ||
+ | |||
= Thursday January 26 = | = Thursday January 26 = | ||
=== Past 24 hours === | === Past 24 hours === | ||
Line 36: | Line 42: | ||
**1 run amo (use it to rejuvenate amo reference in CBREM GUI) | **1 run amo (use it to rejuvenate amo reference in CBREM GUI) | ||
* Trigger fine tuning Thursday? (A. Somov) | * Trigger fine tuning Thursday? (A. Somov) | ||
+ | |||
+ | = Friday January 27 = | ||
+ | === Past 24 hours === | ||
+ | * Production on diamond. ABU= xx h for the day. | ||
+ | |||
+ | === Shift Reports === | ||
+ | * [https://logbooks.jlab.org/entry/ Day shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/ Swing shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/ Owl shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/ Early Riser shift summary] | ||
+ | |||
+ | === Reports === | ||
+ | * [https://logbooks.jlab.org/entry/ Barometric pressure alarm (Hovanes)]. | ||
+ | * MCC is scheduling maintenance for Feb 1st | ||
+ | * Trigger fine tuning Sunday (A. Somov) | ||
+ | <!--* Tagger rest box procedures (A. Somov)--> | ||
+ | |||
+ | === Issues === | ||
+ | <!-- | ||
+ | * [https://logbooks.jlab.org/entry/4116334 Start counter 96 degree rotation in cabling or software space (Simon)]. | ||
+ | **Tentative plan of action: To turn off the low voltage to the SiPM bias for a few specific start counter paddles and take a 1-hour run where we can identify the physical location of these paddles using the tracking detectors. | ||
+ | * [https://logbooks.jlab.org/entry/4116427 DIRC LED TDC missing (David Lawrence, Justin)] [https://logbooks.jlab.org/entry/4117275 DIRC SiPM reference signal (Justin)] | ||
+ | **Tentative plan of action: Chris Stanislav will have a spare this afternoon and Justin will install during an opportunistic access | ||
+ | --> | ||
+ | Pending: | ||
+ | * BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period.Talked to the PD, he will keep in contact with us on how to proceed. | ||
+ | |||
+ | === Plans === | ||
+ | * Production (300 nA, 2h runs) with cycle: | ||
+ | **2 runs para(0/90) | ||
+ | **2 runs perp(0/90) | ||
+ | **2 runs para(45/135) | ||
+ | **2 runs perp(45/135) | ||
+ | **1 run amo (use it to rejuvenate amo reference in CBREM GUI) |
Revision as of 12:12, 26 January 2023
Hall D counting room white board
Contents
Thursday January 26
Past 24 hours
- Production on diamond. ABU= 10 h for the day.
Shift Reports
Reports
- Alternative to barometric pressure measurement (Naomi). Whiteboard instructions have been updated.
- Online calibrations started (Sean)
- MCC is scheduling maintenance for Feb 1st
Issues
- Follow up on HallD dp variation
- Start counter 96 degree rotation in cabling or software space (Simon).
- Tentative plan of action: To turn off the low voltage to the SiPM bias for a few specific start counter paddles and take a 1-hour run where we can identify the physical location of these paddles using the tracking detectors.
- DIRC LED TDC missing (David Lawrence, Justin) DIRC SiPM reference signal (Justin)
- Tentative plan of action: Chris Stanislav will have a spare this afternoon and Justin will install during an opportunistic access
- Fixing FCAL Bases Lockup (Jon)
- Beam Downtime Re-steering Arcs This might need a while to be fixed. They are hoping this fixes some issues they have been seeing in the past few days.
- TPOL GAP (Beni): this is a translation table issue (Justin)
Pending:
- BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period.Talked to the PD, he will keep in contact with us on how to proceed.
- A request for the kitchen lights to be fixed should be submitted next time there is beam downtime.
Plans
- Production (300 nA, 2h runs) with cycle:
- 2 runs para(0/90)
- 2 runs perp(0/90)
- 2 runs para(45/135)
- 2 runs perp(45/135)
- 1 run amo (use it to rejuvenate amo reference in CBREM GUI)
- Trigger fine tuning Thursday? (A. Somov)
Friday January 27
Past 24 hours
- Production on diamond. ABU= xx h for the day.
Shift Reports
Reports
- Barometric pressure alarm (Hovanes).
- MCC is scheduling maintenance for Feb 1st
- Trigger fine tuning Sunday (A. Somov)
Issues
Pending:
- BCM calibration. Accelerator instrumentation group informed us that last BLA calibration was done in 2021 (beside that done last Thursday, 01/19/2023? To be confirmed) and recommend Ops to do one at each start of the run period.Talked to the PD, he will keep in contact with us on how to proceed.
Plans
- Production (300 nA, 2h runs) with cycle:
- 2 runs para(0/90)
- 2 runs perp(0/90)
- 2 runs para(45/135)
- 2 runs perp(45/135)
- 1 run amo (use it to rejuvenate amo reference in CBREM GUI)