Difference between revisions of "Run Planning Meeting Notes, January 19 - January 25, 2023"

From GlueXWiki
Jump to: navigation, search
(Monday January 23)
Line 6: Line 6:
 
=== Shift Reports ===
 
=== Shift Reports ===
 
* Day shift summary [https://logbooks.jlab.org/entry/4113703 Friday], [https://logbooks.jlab.org/entry/4114358 Saturday], [Sunday]
 
* Day shift summary [https://logbooks.jlab.org/entry/4113703 Friday], [https://logbooks.jlab.org/entry/4114358 Saturday], [Sunday]
* Swing shift summary [https://logbooks.jlab.org/entry/4113892 Friday], [Saturday], [Sunday]
+
* Swing shift summary [https://logbooks.jlab.org/entry/4113892 Friday], [https://logbooks.jlab.org/entry/4114507 Saturday], [Sunday]
 
* Owl shift summary [https://logbooks.jlab.org/entry/4114007 Saturday], [Sunday], [Monday]
 
* Owl shift summary [https://logbooks.jlab.org/entry/4114007 Saturday], [Sunday], [Monday]
 
* Early Riser shift summary [https://logbooks.jlab.org/entry/4114137 Saturday], [Sunday], [Monday]
 
* Early Riser shift summary [https://logbooks.jlab.org/entry/4114137 Saturday], [Sunday], [Monday]
Line 17: Line 17:
 
* [https://logbooks.jlab.org/files/2023/01/4114183/HarpScanResultsExtraPolation_01212023_churamani.pdf Harp scan Saturday morning]. Convergence does not look very good, but we decided to run this way for now (amorphous runs).
 
* [https://logbooks.jlab.org/files/2023/01/4114183/HarpScanResultsExtraPolation_01212023_churamani.pdf Harp scan Saturday morning]. Convergence does not look very good, but we decided to run this way for now (amorphous runs).
 
* [https://logbooks.jlab.org/entry/4114336 cdc currents (Beni)]
 
* [https://logbooks.jlab.org/entry/4114336 cdc currents (Beni)]
* []
 
  
  
Line 23: Line 22:
 
* RC volunteers needed (Beni's RC week because of his surgery, and Susan's week because she had to cancel her trip to the US). Hovanes and Simon volunteered to cover the two weeks.
 
* RC volunteers needed (Beni's RC week because of his surgery, and Susan's week because she had to cancel her trip to the US). Hovanes and Simon volunteered to cover the two weeks.
 
* Numerous pressure alarms. [https://logbooks.jlab.org/entry/4114307 Sensor problem? Since Saturday morning, instruction from Lubomir are that we should only acknowledge the alarms. No need for stoping the ongoing run.] [https://logbooks.jlab.org/entry/4114263 See also here.] [https://logbooks.jlab.org/entry/4114344 The suspicious sensor has been removed from the alarm (Hovanes)]
 
* Numerous pressure alarms. [https://logbooks.jlab.org/entry/4114307 Sensor problem? Since Saturday morning, instruction from Lubomir are that we should only acknowledge the alarms. No need for stoping the ongoing run.] [https://logbooks.jlab.org/entry/4114263 See also here.] [https://logbooks.jlab.org/entry/4114344 The suspicious sensor has been removed from the alarm (Hovanes)]
* Beam energy oscillation investigation: Several accelerator experts are looking at it. No consensus whether it is real or not. Since it is at the MeV level, it should not be an issue for GlueX.  
+
* Beam energy oscillation investigation: Several accelerator experts are looking at it. No consensus whether it is real or not. Since it is at the MeV level, it should not be an issue for GlueX (but it is for accelerator).  
 
* 30% increase in rates compared to Summer 2020 run period.
 
* 30% increase in rates compared to Summer 2020 run period.
 
**[https://logbooks.jlab.org/entry/4113855 Yields after BCM recalibration (A. Deur)]
 
**[https://logbooks.jlab.org/entry/4113855 Yields after BCM recalibration (A. Deur)]
 +
** Edy (Hall D Accelerator contact) has been asked to follow up on the issue.
 
* Target control issue.
 
* Target control issue.
 
**[https://logbooks.jlab.org/entry/4113961 Target communication lost around 1pm Friday]. [https://logbooks.jlab.org/entry/4113908 Alarm acknowledged by shift crew without action or calling expert. New shift noticed this and called Hovanes.] Hovanes informed Alexandre who checked what was the issue and call then Chris Carlin. Chris C. could not come (catching a flight at the airport) but instructed the crew to switch the the back-up IOC, which apparently fixed the issue. However, the controlled came back in a confused state (Full but with heater on, an incompatible situation) so Alexandre informed Chris Keith [https://logbooks.jlab.org/entry/4113972 who went in (beam was off for repair during the whole event) with the shift leader (Dene) and partly fixed the issue by switching the target to local control.]
 
**[https://logbooks.jlab.org/entry/4113961 Target communication lost around 1pm Friday]. [https://logbooks.jlab.org/entry/4113908 Alarm acknowledged by shift crew without action or calling expert. New shift noticed this and called Hovanes.] Hovanes informed Alexandre who checked what was the issue and call then Chris Carlin. Chris C. could not come (catching a flight at the airport) but instructed the crew to switch the the back-up IOC, which apparently fixed the issue. However, the controlled came back in a confused state (Full but with heater on, an incompatible situation) so Alexandre informed Chris Keith [https://logbooks.jlab.org/entry/4113972 who went in (beam was off for repair during the whole event) with the shift leader (Dene) and partly fixed the issue by switching the target to local control.]
 
**We can monitor the target, but not control it remotely (switch empty <=> full). For the moment, this is not a crucial problem.
 
**We can monitor the target, but not control it remotely (switch empty <=> full). For the moment, this is not a crucial problem.
 +
* Numerous DIRC alarms Saturday, see [https://logbooks.jlab.org/entry/4114519 this entry], [https://logbooks.jlab.org/entry/4114518 this one], and the comments in the [https://logbooks.jlab.org/entry/4114358 day] and [https://logbooks.jlab.org/entry/4114507 swing] shift summaries.
  
 
=== Plans ===
 
=== Plans ===

Revision as of 18:25, 21 January 2023

Monday January 23

Past 72 hours

  • Beam was off from Friday 7:30am to Saturday 2am due to vacuum issue in south linac.
  • Saturday: Ran on amorphous (goni), 300 nA.

Shift Reports

Reports


Issues

Plans

Friday January 20

Past 24 hours

Shift Reports

Reports

Issues

Plans

  • Thursday evening and Friday night:
    • Once beam come back, do Harp scans.
    • FCup test of our beam dump BCM.
    • Run 1h on the amo radiator of the goni (baseline for next runs below). 250 nA
    • Run 2h on 0.19E-4 RL amo radiator on radiator ladder (250 nA).
    • Run 2h on 1.12E-4 RL amo radiator on radiator ladder (250 nA).
    • Run (until the beam is taken away in the morning) on 3.4E-4 RL amo radiator on radiator ladder (250 nA).
  • Beam off starting Friday morning around 7:30am to fix vacuum issue in south linac, until 4pm(?).
  • When the beam comes back:
    • Harp scans
    • Production on goni amo radiator at 300 nA until Sunday morning.
  • Hall access:
    • Sergey F.
  • Diamond alignment: Sunday morning, ~9am.
  • Until then production on amorphous.
  • Link to runplan

Thursday January 19

Past 24 hours

  • Ran on empty target until 7:20am. Then, beam was taken away for beam and RF study and acceptable beam came back only Thursday at 1:10am. ABU= 4h for the day
  • refilled the target around 4:15pm.
  • Several accesses done during the day:
    • Scot
    • Sergey
    • David Lawrence
    • Cody
  • Took amorphous data, starting around 1:10am after aborted attempt to check diamond alignment.

Shift Reports

Reports

Issues

Plans

  • Beam off starting around 10am for RF study, nominally until 4pm+/-4h.
  • Hall in controlled access?
  • Diamond alignment: Friday day ? (Hovanes unavailable today)
  • Until Friday day, production on amorphous?
  • Link to runplan