Difference between revisions of "Run Planning Meeting Notes, January 19 - January 25, 2023"
From GlueXWiki
(→Issues) |
|||
Line 1: | Line 1: | ||
+ | = Friday January 20 = | ||
+ | === Past 24 hours === | ||
+ | * Ran on amorphous radiator (250 nA) until 10am. Then, beam was taken away for beam and RF study. Beam came back around 5:30pm. We did harp scans and **** ABU= **h for the day | ||
+ | * Several accesses done during the day: | ||
+ | ** Sasha (FADC replacement for TOF) | ||
+ | ** Sergey | ||
+ | |||
+ | === Shift Reports === | ||
+ | * [ Day shift summary] | ||
+ | * [ Swing shift summary] | ||
+ | * [ Owl shift summary] | ||
+ | * [ Early Riser shift summary] | ||
+ | |||
+ | === Reports === | ||
+ | * [ Harp scans] | ||
+ | * [https://logbooks.jlab.org/entry/4113076 FADC replacement for TOF (A. Somov)] | ||
+ | |||
+ | |||
+ | === Issues === | ||
+ | * [https://logbooks.jlab.org/entry/4113047 Beam energy oscillation investigation (M. Tiefenback)] | ||
+ | * 30% increase in transmission compared to Summer 2020 run. | ||
+ | **[https://logbooks.jlab.org/entry/4111933 Original finding by A. Somov] | ||
+ | **[https://logbooks.jlab.org/entry/4113029 Comparison of 2020 and 2023 for TAGH rates (A. Deur)] | ||
+ | **[https://logbooks.jlab.org/entry/4113193 Check that TAGH counters scale with (A. Deur)] | ||
+ | **[https://logbooks.jlab.org/entry/4113098 rho and pi0 yields (A. Austregesilo] | ||
+ | |||
+ | === Plans === | ||
+ | * Beam off starting around 10am for RF study, nominally until 4pm+/-4h. | ||
+ | * Hall in controlled access? | ||
+ | * Diamond alignment: Friday day ? (Hovanes unavailable today) | ||
+ | * Until Friday day, production on amorphous? | ||
+ | * [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Spring2023#Runplan Link to runplan] | ||
+ | |||
= Thursday January 19 = | = Thursday January 19 = | ||
=== Past 24 hours === | === Past 24 hours === |
Revision as of 19:17, 19 January 2023
Contents
Friday January 20
Past 24 hours
- Ran on amorphous radiator (250 nA) until 10am. Then, beam was taken away for beam and RF study. Beam came back around 5:30pm. We did harp scans and **** ABU= **h for the day
- Several accesses done during the day:
- Sasha (FADC replacement for TOF)
- Sergey
Shift Reports
- [ Day shift summary]
- [ Swing shift summary]
- [ Owl shift summary]
- [ Early Riser shift summary]
Reports
- [ Harp scans]
- FADC replacement for TOF (A. Somov)
Issues
- Beam energy oscillation investigation (M. Tiefenback)
- 30% increase in transmission compared to Summer 2020 run.
Plans
- Beam off starting around 10am for RF study, nominally until 4pm+/-4h.
- Hall in controlled access?
- Diamond alignment: Friday day ? (Hovanes unavailable today)
- Until Friday day, production on amorphous?
- Link to runplan
Thursday January 19
Past 24 hours
- Ran on empty target until 7:20am. Then, beam was taken away for beam and RF study and acceptable beam came back only Thursday at 1:10am. ABU= 4h for the day
- refilled the target around 4:15pm.
- Several accesses done during the day:
- Scott
- Sergey
- David Lawrence
- Cody
- Took amorphous data, starting around 1:10am after aborted attempt to check diamond alignment.
Shift Reports
Reports
- Harp scans (just our harp)
- Hovanes attempted to start diamond alignment between 10:50pm-1am. Not able to start due to lack of good beam.
Issues
- TOF rate issues (Beni)
- beam energy oscillation
- 30% increase in transmission compared to Summer 2020 run.
Plans
- Beam off starting around 10am for RF study, nominally until 4pm+/-4h.
- Hall in controlled access?
- Diamond alignment: Friday day ? (Hovanes unavailable today)
- Until Friday day, production on amorphous?
- Link to runplan