Difference between revisions of "Run Planning Meeting Notes, Jan 30-Feb 05, 2020"
From GlueXWiki
m |
m |
||
Line 31: | Line 31: | ||
#** Beni conducts ST counter SiPMT tests [https://logbooks.jlab.org/entry/3776046] | #** Beni conducts ST counter SiPMT tests [https://logbooks.jlab.org/entry/3776046] | ||
#** Finally, beam is back at 9:15pm. | #** Finally, beam is back at 9:15pm. | ||
+ | #* Production | ||
+ | #** in all the chaos over weekend, we managed to collect 6.5B triggers. However, 1.9B events have an unknown diamond orientation, and 1.7B events have beam energy hall. | ||
# Changes | # Changes | ||
#* Change in TPOL readout [https://logbooks.jlab.org/entry/3774906], [https://logbooks.jlab.org/entry/3774990] | #* Change in TPOL readout [https://logbooks.jlab.org/entry/3774906], [https://logbooks.jlab.org/entry/3774990] |
Revision as of 23:30, 2 February 2020
Contents
Wednesday, February 5
- Last 24 hours
- Issues
- Reports
- Plans for today
Tuesday, February 4
- Last 24 hours
- Issues
- Reports
- Plans for today
Monday, February 3
- Last 72 hours
- Friday:
- No beam 10am-12pm (BLA calibration). Opportunistic Hall access
- No beam 3pm-4pm (MCC software update)
- No beam 4pm-11pm (lost vacuum in Hall C transport [1])
- Saturday:
- Goniometer stopped moving sometime between 5am and 3pm. The problem was only noticed at 3pm [2]. As a result, a few runs have unknown diamond orientation [3],[4]
- Repair work on goniometer from 4pm till 7:30pm (no beam) [5]
- Lost HV on TAGH 121-127 and beam halo. HV crate T8-1-BOT has died and wouldn't boot. Repair postponed until next morning [6], [7]
- Sunday:
- Production
- in all the chaos over weekend, we managed to collect 6.5B triggers. However, 1.9B events have an unknown diamond orientation, and 1.7B events have beam energy hall.
- Friday:
- Changes
- Issues
- Noteworthy
- MCC sees our radiator IN & OUT at the same time [18]
- Reports
- Plans for today
- Production
Friday, January 31
- Last 24 hours
- Issues
- Reports
- More on initial PS enhancement [29]
- Plans for today
- We may (or may not) have ~30min for access at 10am
- Production
Thursday, January 30
- Last 24 hours
- Issues
- Reports
- Initial PS enhancement Spring 2020 [39]
- Plans for today
- Any more work on diamond alignment?
- Production