Difference between revisions of "Run Planning Meeting Notes, Jan 30-Feb 05, 2020"
From GlueXWiki
m |
m |
||
Line 17: | Line 17: | ||
== Monday, February 3 == | == Monday, February 3 == | ||
# Last 72 hours | # Last 72 hours | ||
− | #* No beam | + | #* Friday: |
+ | #** No beam 10am-12pm (BLA calibration). Opportunistic Hall access | ||
+ | #** No beam 4pm-9pm (lost vacuum in Hall C transport [https://logbooks.jlab.org/entry/3774952]) | ||
+ | #* Saturday: | ||
+ | #** Goniometer stopped moving sometime between 5am and 3pm. The problem was only noticed at 3pm. | ||
+ | #** Repair work on goniometer from 4pm (no beam) | ||
# Changes | # Changes | ||
#* Change in TPOL readout [https://logbooks.jlab.org/entry/3774906] | #* Change in TPOL readout [https://logbooks.jlab.org/entry/3774906] |
Revision as of 19:41, 1 February 2020
Contents
Wednesday, February 5
- Last 24 hours
- Issues
- Reports
- Plans for today
Tuesday, February 4
- Last 24 hours
- Issues
- Reports
- Plans for today
Monday, February 3
- Last 72 hours
- Friday:
- No beam 10am-12pm (BLA calibration). Opportunistic Hall access
- No beam 4pm-9pm (lost vacuum in Hall C transport [1])
- Saturday:
- Goniometer stopped moving sometime between 5am and 3pm. The problem was only noticed at 3pm.
- Repair work on goniometer from 4pm (no beam)
- Friday:
- Changes
- Issues
- MCC sees our radiator IN & OUT at the same time [4]
- Reports
- Plans for today
- Production
Friday, January 31
- Last 24 hours
- Issues
- Reports
- More on initial PS enhancement [15]
- Plans for today
- We may (or may not) have ~30min for access at 10am
- Production
Thursday, January 30
- Last 24 hours
- Issues
- Reports
- Initial PS enhancement Spring 2020 [25]
- Plans for today
- Any more work on diamond alignment?
- Production