Difference between revisions of "Run Planning Meeting Notes, Jan 23-Jan 29, 2020"
From GlueXWiki
(→Tuesday, January 25 at 08:45) |
(→Tuesday, January 25 at 08:45) |
||
Line 6: | Line 6: | ||
# Last 24 hours | # Last 24 hours | ||
#* First day of production with 350nA beam current! | #* First day of production with 350nA beam current! | ||
+ | #* 11:30 Solenoid trip [https://logbooks.jlab.org/entry/3772377] | ||
# Issues | # Issues | ||
#* TOF point disappearance after window shift [https://logbooks.jlab.org/entry/3772058], [https://logbooks.jlab.org/entry/3772122] | #* TOF point disappearance after window shift [https://logbooks.jlab.org/entry/3772058], [https://logbooks.jlab.org/entry/3772122] | ||
Line 11: | Line 12: | ||
#* Event size increase due to CCal [https://logbooks.jlab.org/entry/3772097] | #* Event size increase due to CCal [https://logbooks.jlab.org/entry/3772097] | ||
# Reports | # Reports | ||
+ | #* Trigger rates and dead time | ||
# Plans for today | # Plans for today | ||
#* No beam study / RF recovery planned | #* No beam study / RF recovery planned |
Revision as of 09:21, 28 January 2020
Contents
Tuesday, January 25 at 08:45
- Last 24 hours
- First day of production with 350nA beam current!
- 11:30 Solenoid trip [1]
- Issues
- Reports
- Trigger rates and dead time
- Plans for today
- No beam study / RF recovery planned
- Diamond alignment later this week
Monday, January 24 at 08:45
- Last 72 hours
- Issues
- Reports
- Tasks for the today
- Increase beam current to 350nA
- Switch off low-energy TagH counters (new EPICS configuration file) [15]
- No beam study / RF recovery planned
- Diamond alignment later this week
- Increase beam current to 350nA
Friday, January 24 at 08:45
- Last 24 hours
- Issues
- Frozen total PS/FCal rates fixed (Hovanes)
- Goniometer image missing [18]
- Reports:
- Updated sigmas for harp fitting tool [19]
- Monitoring Plots
- HOSS Training (David)
- Tasks for the today and the weekend:
- Empty target run after the meeting if beam is taken away
- PS Timing Studies (Friday)?
- Production
- CCAL anode study (Saturday)?
- Monday:
- Increase beam current to 350nA
Thursday, January 23 at 08:45
- Last 24 hours
- Issues
- Reports:
- Transmission [35]
- Tasks for today
- Production
- DOE tour in Hall B/C (8:00 - 12:00?)
- Spin dance (12:00?)
- Plan for later
- CCAL anode study?
- Alternative diamond alignment
- ST trigger?