Difference between revisions of "Run Planning Meeting Notes, Jan 23-Jan 29, 2020"
From GlueXWiki
(→Friday, January 24 at 08:45) |
(→Friday, January 24 at 08:45) |
||
Line 13: | Line 13: | ||
#* Updated sigmas for harp fitting tool [https://logbooks.jlab.org/entry/3768981] | #* Updated sigmas for harp fitting tool [https://logbooks.jlab.org/entry/3768981] | ||
#* [https://logbooks.jlab.org/entry/3769629 Monitoring Plots] | #* [https://logbooks.jlab.org/entry/3769629 Monitoring Plots] | ||
+ | #* HOSS Training (David) | ||
# Tasks for the today and the weekend: | # Tasks for the today and the weekend: | ||
#* Empty target run after the meeting if beam is taken away | #* Empty target run after the meeting if beam is taken away |
Revision as of 09:42, 24 January 2020
Friday, January 24 at 08:45
- Last 24 hours
- Issues
- Frozen total PS/FCal rates fixed (Hovanes)
- Goniometer image missing [3]
- Reports:
- Updated sigmas for harp fitting tool [4]
- Monitoring Plots
- HOSS Training (David)
- Tasks for the today and the weekend:
- Empty target run after the meeting if beam is taken away
- PS Timing Studies (Friday)?
- Production
- CCAL anode study (Saturday)?
- Monday:
- Increase beam current to 350nA
Thursday, January 23 at 08:45
- Last 24 hours
- Issues
- Reports:
- Transmission [20]
- Tasks for today
- Production
- DOE tour in Hall B/C (8:00 - 12:00?)
- Spin dance (12:00?)
- Plan for later
- CCAL anode study?
- Alternative diamond alignment
- ST trigger?