=== Reports ===
 
=== Reports ===
* After coming back from the downtime due to the Hall-d dipole, the diamond needed to be realigned (thanks Hovanes for coming in to take care of this)
+
* After coming back from the downtime due to the Hall-D dipole trip, the diamond needed to be realigned (thanks Hovanes for coming in to take care of this)
**  
+
** [https://logbooks.jlab.org/entry/4138755 Checking alignment of JD70-103 50um diamond]
 +
** [https://logbooks.jlab.org/entry/4138788 PARA and PERP for 0/90 after realignment]
 +
** [https://logbooks.jlab.org/entry/4138800 PARA and PERP for 45/135 after realignment]
 +
** [https://logbooks.jlab.org/entry/4138819 Scan result for TAGM:A:scaler_r1_wf_total_vs_ HD:GONI:Y.RBV_vs_ HD:GONI:X.RBV]
 +
** [https://logbooks.jlab.org/entry/4138821 Snapshot from XY goni scan]
  
 
=== Issues ===
 
=== Issues ===

Revision as of 22:13, 25 February 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count

Sunday February 26

Past 24 hours

  • Production runs

Shift Reports

Early riser Day Swing

Reports

Issues

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Saturday February 25

Past 24 hours

  • Beam came back at about 5:40 am Saturday morning after long downtime due to Hall-D dipole over-temperature trip.

Shift Reports

Early riser Day Swing Owl

Reports

Issues

  • Same pending issues as before...

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Friday February 24

Past 24 hours

Shift Reports

Early riser Day Swing Owl

Reports

Issues

Plans

  • Completion of CCAL installation
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Thursday February 23

Past 24 hours

  • Production runs
  • Cosmic run in raw mode when beam was down: Run 120800

Shift Reports

Early riser Day Swing Owl

Reports

Issues

Plans

  • Completion of CCAL installation: possible during MCC work in NL tomorrow morning ~8:30 for about an hour.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)