Difference between revisions of "Run Planning Meeting Notes, February 23 - February 28, 2023"

From GlueXWiki
Jump to: navigation, search
(Issues)
 
(5 intermediate revisions by the same user not shown)
Line 14: Line 14:
 
=== Past 24 hours ===
 
=== Past 24 hours ===
 
* Production runs
 
* Production runs
 +
* TAGM row-by-row scan
  
 
=== Shift Reports ===
 
=== Shift Reports ===
Line 19: Line 20:
 
[https://logbooks.jlab.org/entry/4140782 Day]
 
[https://logbooks.jlab.org/entry/4140782 Day]
 
[https://logbooks.jlab.org/entry/4140934 Swing]
 
[https://logbooks.jlab.org/entry/4140934 Swing]
 +
[https://logbooks.jlab.org/entry/4140988 Owl]
 +
 +
=== Reports ===
 +
*[https://logbooks.jlab.org/entry/4140983 CCAL check] (Sasha)
  
 
=== Issues ===
 
=== Issues ===
 
*[https://logbooks.jlab.org/entry/4140883 diagnosing problems in the TAGM readout] (Richard)
 
*[https://logbooks.jlab.org/entry/4140883 diagnosing problems in the TAGM readout] (Richard)
 
** [https://logbooks.jlab.org/entry/4140969 TAGM row-by-row scan] (Richard)
 
** [https://logbooks.jlab.org/entry/4140969 TAGM row-by-row scan] (Richard)
 +
** [https://logbooks.jlab.org/entry/4140991 TAGM scalers using only row 4]
 +
** [https://logbooks.jlab.org/entry/4141000 turning off Vbias on rows 1-3 in TAGM] (Richard)
 +
** [https://logbooks.jlab.org/entry/4141052  Coherent peak after TAGM Vbias change]
 +
 +
=== Plans ===
 +
*Production (300 nA, 2h runs) with cycle:
 +
**2 runs PARA (0/90)
 +
**2 runs PERP (0/90)
 +
**2 runs PARA (45/135)
 +
**2 runs PERP (45/135)
 +
**1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
 +
 +
  
 
= Tuesday February 28 =
 
= Tuesday February 28 =

Latest revision as of 07:50, 1 March 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count


Wednesday March 1

Past 24 hours

  • Production runs
  • TAGM row-by-row scan

Shift Reports

Early riser Day Swing Owl

Reports

Issues

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)


Tuesday February 28

Past 24 hours

  • Production runs
  • Down during day shift due to SL dropping to restricted access twice

Shift Reports

Early riser Day Swing Owl

Reports

Issues

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Monday February 27

Past 24 hours

  • Production runs

Shift Reports

Early riser Day Swing Owl

Issues

Sunday February 26

Past 24 hours

  • Production runs

Shift Reports

Early riser Day Swing Owl

Reports

Issues

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Saturday February 25

Past 24 hours

  • Beam came back at about 5:40 am Saturday morning after long downtime due to Hall-D dipole over-temperature trip.

Shift Reports

Early riser Day Swing Owl

Reports

Issues

  • Same pending issues as before...

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Friday February 24

Past 24 hours

Shift Reports

Early riser Day Swing Owl

Reports

Issues

Plans

  • Completion of CCAL installation
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Thursday February 23

Past 24 hours

  • Production runs
  • Cosmic run in raw mode when beam was down: Run 120800

Shift Reports

Early riser Day Swing Owl

Reports

Issues

Plans

  • Completion of CCAL installation: possible during MCC work in NL tomorrow morning ~8:30 for about an hour.
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)