Difference between revisions of "Run Planning Meeting Notes, Feb 27-Mar 05, 2020"
From GlueXWiki
(→Friday, February 28) |
(→Friday, February 28) |
||
Line 22: | Line 22: | ||
#* Production till 11pm with 350nA, then 250nA | #* Production till 11pm with 350nA, then 250nA | ||
#* No beam overnight | #* No beam overnight | ||
− | |||
# Reports/Issues | # Reports/Issues | ||
#* [https://logbooks.jlab.org/entry/3793724 Rate and ratios] | #* [https://logbooks.jlab.org/entry/3793724 Rate and ratios] | ||
#* root_spy crashes when started on Gluon03: [https://logbooks.jlab.org/entry/3793251] [https://logbooks.jlab.org/entry/3793712] | #* root_spy crashes when started on Gluon03: [https://logbooks.jlab.org/entry/3793251] [https://logbooks.jlab.org/entry/3793712] | ||
#* DIRC temperature/communication error [https://logbooks.jlab.org/entry/3793238] | #* DIRC temperature/communication error [https://logbooks.jlab.org/entry/3793238] | ||
− | + | #* Monitoring issue: [https://logbooks.jlab.org/entry/3793304 Low phi,rho,omega yields] [https://logbooks.jlab.org/entry/3793325 FCAL timing difference for run 71933 and 71934] | |
# Run Plan | # Run Plan | ||
#* No beam 8am-10am , Hall B beam restoration software reset. | #* No beam 8am-10am , Hall B beam restoration software reset. | ||
#* Production | #* Production |
Revision as of 09:33, 28 February 2020
Thursday, February 27
- Last 24 hours
- Reports/Issues
- Gluon05 monitors
- DIRC root_spy monitoring plot
- DIRC LV regulation issue: [3] [4]
- Conclusion: adding LV regulation to the DIRC todo list.
- Transmission issue
- Run Plan
- No beam 8am-10am , Hall B beam restoration software reset.
- Production
- Starting with a special HARP scan requested by Hovanes: hall A on at 150nA, 350nA for us, use Tagger_Electron_Left_Halo for analyzing.
Friday, February 28
- Last 24 hours
- Harp and Collimator scan (before :11:30am). Convergence Collimator scan
- Request to change collomator position by Hovanes at 4:30pm [5]
- Production till 11pm with 350nA, then 250nA
- No beam overnight
- Reports/Issues
- Rate and ratios
- root_spy crashes when started on Gluon03: [6] [7]
- DIRC temperature/communication error [8]
- Monitoring issue: Low phi,rho,omega yields FCAL timing difference for run 71933 and 71934
- Run Plan
- No beam 8am-10am , Hall B beam restoration software reset.
- Production