(Thursday, February 27)
(Thursday, February 27)
Line 11: Line 11:
 
#** Conclusion: adding LV regulation to the DIRC todo list.  
 
#** Conclusion: adding LV regulation to the DIRC todo list.  
 
# Run Plan
 
# Run Plan
#* Production
 
 
#* No beam 8am-10am , Hall B beam restoration software reset.
 
#* No beam 8am-10am , Hall B beam restoration software reset.
 +
#* Production
 +
# Starting with a special HARP scan requested by Hovanes: hall A on at 150nA, 350nA for us, use Tagger_Electron_Left_Halo for analyzing.

Revision as of 09:36, 27 February 2020

Thursday, February 27

  1. Last 24 hours
    • Harpscan done at 12:43pm.
    • Good production afternoon-7 pm
    • tripy beam 7:00pm - 9:30pm: beam tripping off tagger BLM. Asked to shift 5C11B x position from -0.5 to -0.75.[1]
    • No beam 11:00 pm - 7:00 am
  2. Reports/Issues
  3. Run Plan
    • No beam 8am-10am , Hall B beam restoration software reset.
    • Production
  4. Starting with a special HARP scan requested by Hovanes: hall A on at 150nA, 350nA for us, use Tagger_Electron_Left_Halo for analyzing.