Difference between revisions of "Run Planning Meeting Notes, Feb 23- Mar 1, 2017"

From GlueXWiki
Jump to: navigation, search
(Thursday, February 23)
(Friday, February 24)
Line 54: Line 54:
 
# Accelerator Status over the last 24 hrs
 
# Accelerator Status over the last 24 hrs
 
#* Beam was mostly:  
 
#* Beam was mostly:  
#**  
+
#** Stable
#** Downtime incidents of more than 30 minutes:
+
#**
#***  
+
 
#* Harp scans:  
 
#* Harp scans:  
 
#** [https://logbooks.jlab.org/entry/3461613 Beam line], [https://logbooks.jlab.org/entry/3461957  Radiator]
 
#** [https://logbooks.jlab.org/entry/3461613 Beam line], [https://logbooks.jlab.org/entry/3461957  Radiator]
Line 70: Line 69:
 
#** Alex Barnes and Trent Allison  found problem to be low voltage power supply, repair completed 11:55am [https://logbooks.jlab.org/entry/3461800 ELOG].
 
#** Alex Barnes and Trent Allison  found problem to be low voltage power supply, repair completed 11:55am [https://logbooks.jlab.org/entry/3461800 ELOG].
 
#* DAQ issues:
 
#* DAQ issues:
#**  
+
#** Crash, Sergey helped recovering (approx. 45 min)
 
# Monitoring
 
# Monitoring
#*  
+
#* [https://logbooks.jlab.org/entry/3462081 Lowlevel monitoring report]
 +
#* Increase of FCAL channels with high rates:[https://logbooks.jlab.org/entry/3461979 30770], [https://logbooks.jlab.org/entry/3461999 30778],[https://logbooks.jlab.org/entry/3462031 30780], [https://logbooks.jlab.org/entry/3462060 30783]
 
# Run Plan
 
# Run Plan
 
#* Empty target run ?
 
#* Empty target run ?
Line 78: Line 78:
 
#* HIgh luminosity ?
 
#* HIgh luminosity ?
 
# Offline Analysis
 
# Offline Analysis
#*  
+
#* [https://logbooks.jlab.org/entry/3462007 Rate estimates, Simon]
 +
#* [https://logbooks.jlab.org/entry/3461972 Tagger Magnet behavior, Alexandre]
 
# Any Other Business
 
# Any Other Business

Revision as of 07:43, 24 February 2017

<- Back to Run Coordination Meetings: Spring 2017 Run

Thursday, February 23

Shift ABU BNA BANU
Day 5.11 1.07 1.82
Swing 6.46 0.77 0.76
Owl 2.35 0.00 5.65
Total 13.92 1.85 8.23
  1. Accelerator Status over the last 24 hrs
    • Beam was mostly
      • Stable until midnight
    • Harp scans:
      • Beam was re-focused around noon ELOG
      • final MCC scans : IHA5C11, IHA5C11B
      • Radiator HARP scans: Radiator Harp
        • (Sigma_X, Sigma_Y) is (0.85,0.55), (0.65, 0.49), and (0.73, 0.43).
      • new Harp scans as part of beam steering problem: MCC, Radiator Harp
  1. Hall-D/GlueX items
      • Downtime incidents of more than 30 minutes:
        • DAQ 10:45 for about 40 min. , Sergey helped
        • Beam position lock on active collimator steered the beam away: 00:15
        • Traced problem to pre-amp problem in inner AC (dead or needs to be reset, power cycled ?)
        • Total triggers collected: 1400 M
  2. Issues
    • Active collimator
    • DAQ issues:
      • difficult restart at 10:45pm
  3. Monitoring
  4. Run Plan
    • Repair active collimator.
    • HIgh luminosity ?
  5. Offline Analysis?
  6. Any Other Business?

Friday, February 24

  1. Accelerator Status over the last 24 hrs
    • Beam was mostly:
      • Stable
    • Harp scans:
  2. Hall-D/GlueX items
    • In the last 24 hours:
      • Feb 23: Total triggers collected: M
  3. Issues
    • Active Collimator repair
      • Rebooting IOC did not help
      • Alex Barnes and Trent Allison found problem to be low voltage power supply, repair completed 11:55am ELOG.
    • DAQ issues:
      • Crash, Sergey helped recovering (approx. 45 min)
  4. Monitoring
  5. Run Plan
    • Empty target run ?
    • TAC run ?
    • HIgh luminosity ?
  6. Offline Analysis
  7. Any Other Business