Difference between revisions of "Run Planning Meeting Notes, Feb 23- Mar 1, 2017"

From GlueXWiki
Jump to: navigation, search
(Created page with "<- Back to Run Coordination Meetings: Spring 2017 Run * [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calend...")
 
Line 13: Line 13:
 
#*** TBD
 
#*** TBD
 
#** No significant accelerator downtime  
 
#** No significant accelerator downtime  
#* Beam studies
+
#* Harp scan:
#* Harp scan:
+
#** Beam was re-focused [https://logbooks.jlab.org/entry/3461340 ELOG]
#** MCC scans at
+
#** final  MCC scans : [https://logbooks.jlab.org/entry/3461330  IHA5C11], [https://logbooks.jlab.org/entry/3461337 IHA5C11B]
#*** (Sigma_X, Sigma_Y) is (TBD), (TBD), and (TBD).  
+
#** Radiator HARP scans: [https://logbooks.jlab.org/entry/3461348 Radiator Harp]
 +
#*** (Sigma_X, Sigma_Y) is (0.85,0.55), (0.65, 0.49), and (0.73, 0.43).  
 
# Hall-D/GlueX items
 
# Hall-D/GlueX items
 
#* In the last 24 hours:  
 
#* In the last 24 hours:  

Revision as of 17:38, 22 February 2017

<- Back to Run Coordination Meetings: Spring 2017 Run

Thursday, February 23

  1. Accelerator Status over the last 24 hrs
    • Beam was mostly
      • TBD
      • Downtime incidents of more than 30 minutes:
        • TBD
        • TBD
      • No significant accelerator downtime
    • Harp scan:
      • Beam was re-focused ELOG
      • final MCC scans : IHA5C11, IHA5C11B
      • Radiator HARP scans: Radiator Harp
        • (Sigma_X, Sigma_Y) is (0.85,0.55), (0.65, 0.49), and (0.73, 0.43).
  2. Hall-D/GlueX items
    • In the last 24 hours:
      • Feb 22: ABU TBD hrs (TBD), BANU TBD hrs (TBD)
      • Feb 22: Total triggers collected: TBD M
  3. Issues
    • TBD
    • DAQ issues:
      • TBD
      • TBD
  4. Monitoring
    • New
  5. Run Plan
    • Production, production, production...
    • Do we need an empty target run ?
  6. Offline Analysis?
  7. Any Other Business?