(Friday, February 20)
Line 10: Line 10:
 
#* Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.
 
#* Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.
  
==  Friday, February 20 ==  
+
==  Friday, February 21 ==  
 
# Last 24 hours
 
# Last 24 hours
 
#* Production running for us
 
#* Production running for us
Line 26: Line 26:
 
#* Tuesday there will be 3 hour access due to laser work
 
#* Tuesday there will be 3 hour access due to laser work
 
#* Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.
 
#* Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.
 +
 +
==  Monday, February 24 ==
 +
# Last 48 hours
 +
#* Production running
 +
#** 6hr accelerator downtime Saturday afternoon due to an IOC problem that led to a series of issues [https://logbooks.jlab.org/entry/3789843]
 +
#** New BCAL pedestals
 +
#** MCC increased ion chamber trip level by 3-5%
 +
# Reports/Issues
 +
#* [https://logbooks.jlab.org/entry/3788922 BCAL gains changed in a number of modules]- Mark
 +
#* [https://logbooks.jlab.org/entry/3789786 Convergence look normal]
 +
#* [https://logbooks.jlab.org/entry/3790042 Calibrations needed updating, should be fixed]
 +
#* [https://logbooks.jlab.org/entry/3790286 Missing RCDB variables]-Alex

Revision as of 22:52, 23 February 2020

Thursday, February 20

  1. Last 24 hours
    • Smooth production running (18hrs/24hrs with beam)
  2. Reports
  3. Run Plan
    • Production running
    • Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.

Friday, February 21

  1. Last 24 hours
  2. Reports
  3. Run Plan
    • Production running over the weekend
      • List for opportunistic access? Nothing scheduled now.
    • Tuesday there will be 3 hour access due to laser work
    • Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.

Monday, February 24

  1. Last 48 hours
    • Production running
      • 6hr accelerator downtime Saturday afternoon due to an IOC problem that led to a series of issues [4]
      • New BCAL pedestals
      • MCC increased ion chamber trip level by 3-5%
  2. Reports/Issues