Difference between revisions of "Run Planning Meeting Notes, Feb 20-Feb 26, 2020"

From GlueXWiki
Jump to: navigation, search
(Friday, February 20)
(Friday, February 20)
Line 13: Line 13:
 
# Last 24 hours
 
# Last 24 hours
 
#* Production Running
 
#* Production Running
#* [https://logbooks.jlab.org/entry/3788233 MCC adjusted AD00 due to BLM trips]
+
#* [https://logbooks.jlab.org/entry/3788233 MCC adjusted AD00 due to BLM trips without informing us]
 
# Reports
 
# Reports
 
#* [https://logbooks.jlab.org/entry/3788087], [https://logbooks.jlab.org/entry/3788335], [https://logbooks.jlab.org/entry/3788355] BCAL gains and temperature have changed after the incident - Mark
 
#* [https://logbooks.jlab.org/entry/3788087], [https://logbooks.jlab.org/entry/3788335], [https://logbooks.jlab.org/entry/3788355] BCAL gains and temperature have changed after the incident - Mark
 
#* [https://logbooks.jlab.org/entry/3788140 Convergence looks as it usually does]
 
#* [https://logbooks.jlab.org/entry/3788140 Convergence looks as it usually does]
 
#* [https://logbooks.jlab.org/entry/3788260 PS enhancement after beam spot move]-Justin
 
#* [https://logbooks.jlab.org/entry/3788260 PS enhancement after beam spot move]-Justin
 +
#* [https://logbooks.jlab.org/entry/3788677 DIRC Tile Temperature alarm]
  
 
# Run Plan
 
# Run Plan
 
#* Production running
 
#* Production running
 
#* Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.
 
#* Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.

Revision as of 08:07, 21 February 2020

Thursday, February 20

  1. Last 24 hours
    • Smooth production running (18hrs/24hrs with beam)
  2. Reports
  3. Run Plan
    • Production running
    • Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.

Friday, February 20

  1. Last 24 hours
  2. Reports
  1. Run Plan
    • Production running
    • Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.