(Friday, February 20)
(Tuesday, February 26)
 
(18 intermediate revisions by 2 users not shown)
Line 10: Line 10:
 
#* Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.
 
#* Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.
  
==  Friday, February 20 ==  
+
==  Friday, February 21 ==  
 
# Last 24 hours
 
# Last 24 hours
#* Production Running
+
#* Production running for us
 +
#** ESR issue which caused ~12 hour downtime for halls A-C
 
#* [https://logbooks.jlab.org/entry/3788233 MCC adjusted AD00 due to BLM trips without informing us]
 
#* [https://logbooks.jlab.org/entry/3788233 MCC adjusted AD00 due to BLM trips without informing us]
 
# Reports
 
# Reports
 
#* [https://logbooks.jlab.org/entry/3788087], [https://logbooks.jlab.org/entry/3788335], [https://logbooks.jlab.org/entry/3788355] BCAL gains and temperature have changed after the incident - Mark
 
#* [https://logbooks.jlab.org/entry/3788087], [https://logbooks.jlab.org/entry/3788335], [https://logbooks.jlab.org/entry/3788355] BCAL gains and temperature have changed after the incident - Mark
#* [https://logbooks.jlab.org/entry/3788140 Convergence looks as it usually does]
+
#* [https://logbooks.jlab.org/entry/3788140 Convergence looks fine]
 
#* [https://logbooks.jlab.org/entry/3788260 PS enhancement after beam spot move]-Justin
 
#* [https://logbooks.jlab.org/entry/3788260 PS enhancement after beam spot move]-Justin
 +
#* [https://logbooks.jlab.org/entry/3788707 Rates]- Alexandre
 
#* [https://logbooks.jlab.org/entry/3788677 DIRC Tile Temperature alarm]
 
#* [https://logbooks.jlab.org/entry/3788677 DIRC Tile Temperature alarm]
 +
# Run Plan
 +
#* Production running over the weekend
 +
#** List for opportunistic access? Nothing scheduled now.
 +
#* Tuesday there will be 3 hour access due to laser work
 +
#* Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.
  
 +
==  Monday, February 24 ==
 +
# Last 48 hours
 +
#* Production running
 +
#** 6hr accelerator downtime Saturday afternoon due to an IOC problem that led to a series of issues [https://logbooks.jlab.org/entry/3789843]
 +
#** New BCAL pedestals
 +
#** Quick access to reboot FCAL pdu
 +
#** MCC increased ion chamber trip level by 3-5%. Seems to have been successful in reducing trips
 +
#* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2019-11/index.html Surpassed 100B triggers]
 +
# Reports/Issues
 +
#* [https://logbooks.jlab.org/entry/3788922 BCAL gains changed in a number of modules]- Mark
 +
#* [https://logbooks.jlab.org/entry/3789786 Convergence look normal]
 +
#* [https://logbooks.jlab.org/entry/3790286 Missing RCDB variables]-Alex
 +
#* [https://logbooks.jlab.org/entry/3790042], [https://logbooks.jlab.org/entry/3790633] Timing calibrations not updating, should be fixed in a day or so
 
# Run Plan
 
# Run Plan
 +
#* Production Running
 +
#* Maybe access tomorrow? Hopefully will know by end of day
 +
#* No beam 9am-12pm Wednesday due to safety meeting
 +
#**We can not access the hall during this time
 +
 +
==  Tuesday, February 25 ==
 +
# Last 24 hours
 
#* Production running
 
#* Production running
#* Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.
+
# Reports/Issues
 +
#* Timing calibration updated
 +
#*[https://logbooks.jlab.org/entry/3791052 Convergence looks good]
 +
#* Alcohol level in top bubbler is low
 +
# Run Plan
 +
#* Production Running
 +
#* Access 8:30am-12:30pm
 +
#* No beam 9am-12pm Wednesday due to safety meeting
 +
 
 +
==  Wednesday, February 26 ==
 +
# Last 24 hours
 +
#*Access during accelerator maintenance (8:30-"12:30". Actual recovery happened at 18:00):
 +
#**Colin turned on PDU for FCAL.
 +
#**Scott and Mark reset Chimney 4 cold cathode gauge.
 +
#**Sergei installed new radiators for the TRD.
 +
#**Raw mode runs taken (RAW_ALL_NOSPARS or RAW_ALL_NOSPARS_NEW)
 +
#* Production running
 +
# Reports/Issues
 +
#*RC Colin Gleason was diagnosed with flu: AD is acting RC.
 +
#*[https://logbooks.jlab.org/entry/3791657 DIRC alarms], [https://logbooks.jlab.org/entry/3791750 fixed by Bill]
 +
#*Alcohol level in top bubbler topped off.
 +
#*[https://logbooks.jlab.org/entry/3791827 NMR probed for tagger had stopped working without alarm]
 +
#*[https://logbooks.jlab.org/entry/3791822 ComCal humidity is rising.]
 +
# Run Plan
 +
#* Production
 +
#* No beam nor access 9am-12pm today due to MCC safety meeting. SSO will be manned but only for emergency:
 +
#**From Director of Operations C. Ginsburg: "Most of accelerator division will be in meetings during that time.  No accelerator work will be allowed: no beam, no accesses, no repairs, no work in the test lab, etc.  We will have one SSO on shift and one crew chief on-call.  Experimenters shall not have accesses.  In case of human emergency, please call 911 as usual.  In case of equipment emergency (fire, helium plume, etc.), please call the SSO and we will address the problem as appropriate.  RadCon is not affected by our stand down."

Latest revision as of 09:29, 26 February 2020

Thursday, February 20

  1. Last 24 hours
    • Smooth production running (18hrs/24hrs with beam)
  2. Reports
  3. Run Plan
    • Production running
    • Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.

Friday, February 21

  1. Last 24 hours
  2. Reports
  3. Run Plan
    • Production running over the weekend
      • List for opportunistic access? Nothing scheduled now.
    • Tuesday there will be 3 hour access due to laser work
    • Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.

Monday, February 24

  1. Last 48 hours
    • Production running
      • 6hr accelerator downtime Saturday afternoon due to an IOC problem that led to a series of issues [4]
      • New BCAL pedestals
      • Quick access to reboot FCAL pdu
      • MCC increased ion chamber trip level by 3-5%. Seems to have been successful in reducing trips
    • Surpassed 100B triggers
  2. Reports/Issues
  3. Run Plan
    • Production Running
    • Maybe access tomorrow? Hopefully will know by end of day
    • No beam 9am-12pm Wednesday due to safety meeting
      • We can not access the hall during this time

Tuesday, February 25

  1. Last 24 hours
    • Production running
  2. Reports/Issues
  3. Run Plan
    • Production Running
    • Access 8:30am-12:30pm
    • No beam 9am-12pm Wednesday due to safety meeting

Wednesday, February 26

  1. Last 24 hours
    • Access during accelerator maintenance (8:30-"12:30". Actual recovery happened at 18:00):
      • Colin turned on PDU for FCAL.
      • Scott and Mark reset Chimney 4 cold cathode gauge.
      • Sergei installed new radiators for the TRD.
      • Raw mode runs taken (RAW_ALL_NOSPARS or RAW_ALL_NOSPARS_NEW)
    • Production running
  2. Reports/Issues
  3. Run Plan
    • Production
    • No beam nor access 9am-12pm today due to MCC safety meeting. SSO will be manned but only for emergency:
      • From Director of Operations C. Ginsburg: "Most of accelerator division will be in meetings during that time. No accelerator work will be allowed: no beam, no accesses, no repairs, no work in the test lab, etc. We will have one SSO on shift and one crew chief on-call. Experimenters shall not have accesses. In case of human emergency, please call 911 as usual. In case of equipment emergency (fire, helium plume, etc.), please call the SSO and we will address the problem as appropriate. RadCon is not affected by our stand down."