Difference between revisions of "Run Planning Meeting Notes, Feb 16-Feb 22, 2017"
From GlueXWiki
m |
m |
||
Line 8: | Line 8: | ||
==Thursday, February 16== | ==Thursday, February 16== | ||
# Accelerator Status | # Accelerator Status | ||
+ | #* Stable accelerator running over the last 24 hours | ||
+ | #* Harp scans: | ||
+ | #** MCC scans [before https://logbooks.jlab.org/entry/3458630] and [after https://logbooks.jlab.org/entry/3458638] Todd's script | ||
+ | #***"Good enough -- horizontal convergence is nearly spot on, and vertical convergence is a little shallow but ok." | ||
+ | #** Our scan: [before https://logbooks.jlab.org/entry/3458624] and [after https://logbooks.jlab.org/entry/3458635] Todd's script | ||
+ | #** In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator: | ||
+ | #*** Before: (1.31, 0.63), (1.08, 0.73), (1.03, 0.41) | ||
+ | #*** After : (1.07, 0.51), (0.79, 0.50), (0.78, 0.32) | ||
+ | #* Convergence studies from Hovanes: [Feb 15 https://logbooks.jlab.org/entry/3458654] vs [Feb 9 https://logbooks.jlab.org/entry/3458258] | ||
+ | #** Beam sigma at the radiator: 0.6cm (Feb 15) vs 0.5cm (Feb 9) | ||
+ | #*** "... uncertainties ... a lot larger compared to Feb 9. It is hard to make any conclusions about the improvement of the spot." | ||
+ | |||
# Hall-D/GlueX items | # Hall-D/GlueX items | ||
+ | #* | ||
+ | #* RootSpy tips: | ||
+ | #** Restarting cMsg server: [https://logbooks.jlab.org/entry/3458608] | ||
# Monitoring | # Monitoring | ||
# Run Plan | # Run Plan | ||
#* Production data | #* Production data | ||
+ | #* Hall safety walk-through is supposed to happen between 7:00 AM and 7:30 AM | ||
# Offline Analysis? | # Offline Analysis? | ||
# Any Other Business? | # Any Other Business? | ||
− |
Revision as of 07:17, 16 February 2017
<- Back to Run Coordination Meetings: Spring 2017 Run
Thursday, February 16
- Accelerator Status
- Stable accelerator running over the last 24 hours
- Harp scans:
- MCC scans [before https://logbooks.jlab.org/entry/3458630] and [after https://logbooks.jlab.org/entry/3458638] Todd's script
- "Good enough -- horizontal convergence is nearly spot on, and vertical convergence is a little shallow but ok."
- Our scan: [before https://logbooks.jlab.org/entry/3458624] and [after https://logbooks.jlab.org/entry/3458635] Todd's script
- In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
- Before: (1.31, 0.63), (1.08, 0.73), (1.03, 0.41)
- After : (1.07, 0.51), (0.79, 0.50), (0.78, 0.32)
- MCC scans [before https://logbooks.jlab.org/entry/3458630] and [after https://logbooks.jlab.org/entry/3458638] Todd's script
- Convergence studies from Hovanes: [Feb 15 https://logbooks.jlab.org/entry/3458654] vs [Feb 9 https://logbooks.jlab.org/entry/3458258]
- Beam sigma at the radiator: 0.6cm (Feb 15) vs 0.5cm (Feb 9)
- "... uncertainties ... a lot larger compared to Feb 9. It is hard to make any conclusions about the improvement of the spot."
- Beam sigma at the radiator: 0.6cm (Feb 15) vs 0.5cm (Feb 9)
- Hall-D/GlueX items
- RootSpy tips:
- Restarting cMsg server: [1]
- RootSpy tips:
- Monitoring
- Run Plan
- Production data
- Hall safety walk-through is supposed to happen between 7:00 AM and 7:30 AM
- Offline Analysis?
- Any Other Business?