(Thursday, February 1)
Line 10: Line 10:
 
#* [https://logbooks.jlab.org/entry/3525087 Low level monitoring]
 
#* [https://logbooks.jlab.org/entry/3525087 Low level monitoring]
 
# Issues:
 
# Issues:
 +
#* [https://logbooks.jlab.org/entry/3525094 Missing BCAL LED triggers and Random pulser (Run 41172)]
 
#* [https://logbooks.jlab.org/entry/3524812 TAC setup]
 
#* [https://logbooks.jlab.org/entry/3524812 TAC setup]
 
#* [https://logbooks.jlab.org/entry/3524817 TPOL dead channel].
 
#* [https://logbooks.jlab.org/entry/3524817 TPOL dead channel].

Revision as of 08:38, 1 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, February 1

  1. Notes from the previous 24 hours:
    • After empty target run, beam intermittent. Trouble setting up V-wire TAC run, due to lock on Active Collimator not providing consistent TAC rate.
    • 8 PM start production TAC run with lock on Beam Profiler. TAC rate initially at ~200 kHz, but dropped to 100 kHz overnight.
    • 5:30 AM stopped the TAC run and switch to production: target filled, beamline back in production configuration and production run started.
    •  ? hours of CW beam. BAU: ? hrs (?+?+?), BANU: ? hrs (?+?+?)
    • Spreadsheet: number of triggers.
    • Low level monitoring
  2. Issues:
  3. Run plan for this week:
    • Low intensity runs planned for tonight: what is the status of min-bias triggers?
  4. Today's run plan:
    • At 9 AM (or after run production run 41172):
      • Harp scans by MCC and Hall D (Hovanes on shift)
    • Production running the rest of the day
  5. Reports:
  6. Standing issues:
    • Rate evolution: Work ongoing to compare rho yields to PS flux before and after "step" in PS rate.