Difference between revisions of "Run Planning Meeting Notes, Feb 06-Feb 12, 2020"
From GlueXWiki
(→Thursday, February 6) |
(→Thursday, February 6) |
||
Line 4: | Line 4: | ||
#* Harp scans (see reports for details) | #* Harp scans (see reports for details) | ||
#* Production runs @ 350nA | #* Production runs @ 350nA | ||
+ | #* Collected 1.8B events | ||
# Issues | # Issues | ||
#* DIRC temperature alarm (resolved, see: [https://logbooks.jlab.org/entry/3778666]) | #* DIRC temperature alarm (resolved, see: [https://logbooks.jlab.org/entry/3778666]) | ||
Line 12: | Line 13: | ||
#* Missing optical links in DIRC (see: [https://logbooks.jlab.org/entry/3778193]) | #* Missing optical links in DIRC (see: [https://logbooks.jlab.org/entry/3778193]) | ||
# Plans for today | # Plans for today | ||
+ | #* Production runs |
Revision as of 09:31, 6 February 2020
Thursday, February 6
- Last 24 hours
- Beam was sent to hall at 19:51
- Harp scans (see reports for details)
- Production runs @ 350nA
- Collected 1.8B events
- Issues
- DIRC temperature alarm (resolved, see: [1])
- Swing shift reported coherent peak for JD70-105 0/90 PARA to be unusually wide -> No such observations for other settings
- Reports
- Harp scan results: acc: 5C11,acc: 5C11B, Hall D: TAGH
- Test of DIRC communication algorithm (see: [2])
- Missing optical links in DIRC (see: [3])
- Plans for today
- Production runs