=== Last 24h ===
*Took LHe data for ~???B events from yesterday
+
*We were running pretty smoothly, no major issues
 +
*Took LHe data for ~3.4B events from yesterday
 +
*Hall-A during today will run at low current 1-µA, and during weekend they will resume running at 36µA
 +
 
  
 
=== Shift Summaries ===
 
=== Shift Summaries ===
*Day shift 12/08 10:00-16:00  
+
*Day shift 12/08 10:00-16:00 https://logbooks.jlab.org/entry/4098611
*Swing shift 12/08 16:00-22:00  
+
*Swing shift 12/08 16:00-22:00 https://logbooks.jlab.org/entry/4098735
*OWL 12/08-12/09 22:00-04:00  
+
*OWL 12/08-12/09 22:00-04:00 https://logbooks.jlab.org/entry/4098860
*Early Riser 12/09 04:00-10:00  
+
*Early Riser 12/09 04:00-10:00 https://logbooks.jlab.org/entry/4098960
  
 
=== Issues ===
 
=== Issues ===
*
+
* Some FCAL bases were locked up
  
 
=== Short term run plan ===
 
=== Short term run plan ===
 
*Take date on LHe FULL target at 200nA beam
 
*Take date on LHe FULL target at 200nA beam
 +
*TAC run???
  
 
= Thursday Dec. 8th =
 
= Thursday Dec. 8th =

Revision as of 09:00, 9 December 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Friday Dec. 9th

Last 24h

  • We were running pretty smoothly, no major issues
  • Took LHe data for ~3.4B events from yesterday
  • Hall-A during today will run at low current 1-µA, and during weekend they will resume running at 36µA


Shift Summaries

Issues

  • Some FCAL bases were locked up

Short term run plan

  • Take date on LHe FULL target at 200nA beam
  • TAC run???

Thursday Dec. 8th

Last 24h

  • Wednesday was RF recovery day, Hall was in Controlled Access till ~6:30pm, many things where done during access in Hall.
    • Hall (Controlled Access):
      • Tim worked on Tagger magnet NMR [1]
      • Sasha replaced the BCAL fADC [2]
      • DIRC checkout (Justin+1).
      • Sasha, Vlad, Lubomir, Sergei and Arshak: work in the PS test area.
      • Sasha, Arshak and Malte did some preliminary noise level tests at FCAL
      • Mark Stevens: walkthrough for OPS.
      • Tim and Eugene checked the man-lift
      • Tim and Sasha checked by how much FCal can be pushed back (for some tentative PrimEx systematic measurements).
  • After beam comes back:

Shift Summaries

Issues

Short term run plan

  • TAC run? (may be on weekend)
  • Take date on LHe FULL target at 200nA beam