+ | == Friday, Dec 6 at 08:45 == | ||
+ | # Last 24h: | ||
+ | #* Collected enough straight track data for GEM at beam left, moved it to beam right during first access. | ||
+ | #* Other work done during access: FADC replaced on GEM/TRD. | ||
+ | #* GEM/TRD firmware updated between beam left and beam right running | ||
+ | #* [https://logbooks.jlab.org/entry/3747124 Hovanes disabled the alarms on two TOF channels which have faulty HV boards] | ||
+ | #Issues | ||
+ | # Plan for today | ||
+ | #* Ramp solenoid | ||
+ | # Plan for later | ||
+ | #* Spin dance likely Monday or Tuesday. We can have beam for some of this time. | ||
+ | #* Diamond alignment on Wednesday? | ||
+ | #Notes from this meeting. |
Revision as of 16:19, 5 December 2019
<- Back to Run Coordination Meetings:Fall2019 Run
- Acc whiteboard
- Counting house whiteboard
- Hall D schedule for week 1
- Hall D schedule for week 2
- BTA guidelines
Thursday, Dec 5 at 08:45
- Last 24h:
- Straight tracks during the day, Justin & Sean working to debug recon and analyze the data
- Sean got the general detector checkout done.
- Sasha did the PS threshold scan and set up the PS trigger for Richard's uscope scan
- Sasha set up trigger config for straight tracks excluding uscope so Richard can work independently
- Richard's uscope scans half done, interrupted by ghost PSS button press from tagger hall, no beam from approx 9pm - 1am?
- Lubomir's logentry
- Issues
- Solenoid alarm
- PSS fault
- GEM cable or module swap
- Plan for today
- After the meeting (TBD Justin), move GEM to position 2, fix electronics problem, then take more data until ~4pm?
- Move GEM to position 3, then take more data until ~6am Friday?
- Plan for later
- Alexandre's comprehensive runplan now at 3-4
- Notes from this meeting.
- Also need to check the GEM readout config
- Beam time request from David for CPP
- Radiation levels report from Alexandre
- Repeated alarms for TAGH 151
Friday, Dec 6 at 08:45
- Last 24h:
- Collected enough straight track data for GEM at beam left, moved it to beam right during first access.
- Other work done during access: FADC replaced on GEM/TRD.
- GEM/TRD firmware updated between beam left and beam right running
- Hovanes disabled the alarms on two TOF channels which have faulty HV boards
- Issues
- Plan for today
- Ramp solenoid
- Plan for later
- Spin dance likely Monday or Tuesday. We can have beam for some of this time.
- Diamond alignment on Wednesday?
- Notes from this meeting.