Revision as of 19:44, 5 December 2018
Wed, Dec 5 at 8:45 =
- Several items were fixed during a controlled access in the morning
- Amorphous radiator ladder
- A few bad FCAL bases were replaced
- CCAL LED trigger time delay was adjusted
- Production trigger rate study was performed during afternoon