(Thursday, Dec 12 at 08:45)
Line 24: Line 24:
 
#** https://logbooks.jlab.org/entry/3751968
 
#** https://logbooks.jlab.org/entry/3751968
  
== Thursday, Dec 12 at 08:45 ==  
+
== Friday, Dec 13 at 08:45 ==  
 
# Last 24h:
 
# Last 24h:
 
#* DIRC Gem data beam center configuration collected additional 5M trigger (6m triggers in total).
 
#* DIRC Gem data beam center configuration collected additional 5M trigger (6m triggers in total).
Line 55: Line 55:
 
#* Monitoring
 
#* Monitoring
 
#** https://logbooks.jlab.org/entry/3752719
 
#** https://logbooks.jlab.org/entry/3752719
 +
 +
 +
== Monday, Dec 16 at 08:45 ==
 +
# Weekend running:
 +
#* DIRC Gem data beam left configuration collected additional 6M trigger.
 +
#** Xenon gas test is included
 +
#** https://logbooks.jlab.org/entry/3754114
 +
#** https://logbooks.jlab.org/entry/3754118
 +
#* High rate trigger test completed
 +
#** Bottle neck: DIRC at 250-300 nA.
 +
#** Sasha is preparing a special trigger configuration
 +
#* DIRC commissioning data:
 +
#* Nominal configuration (Moroc threshold=100)~3B triggers
 +
#* Moroc threshold=50 ~ 2B trigger (this weekend)
 +
# Issues
 +
#* Root_spy crash
 +
#* Gluon05 monitor blinking issue
 +
#* DIRC reference signal found in the stand alone configuration
 +
#* TAGM translation table
 +
#* Data corruption issue in the beginning of the run.
 +
#* DIRC issues:
 +
#** Missing tiles: https://logbooks.jlab.org/entry/3754151
 +
#** Anomaly DIRC occupancy: https://logbooks.jlab.org/entry/3753658
 +
#* Gluon04 desktop manager
 +
# Task for today
 +
#* Hall Work
 +
#** Relocate GEM/TRD to beam right position
 +
#** Installing additional flash module (Sasha)
 +
# Plan for later
 +
#* More test will be after Wednesday
 +
#** Current TAC run and TAGM accidental run.
 +
#* [http://accboard.acc.jlab.org/ whiteboard]
 +
#* Monitoring
 +
#** https://logbooks.jlab.org/entry/3754359

Revision as of 09:42, 16 December 2019

Thursday, Dec 12 at 08:45

  1. Last 24h:
  2. Issue:
    • DAQ crash
      • DAQ issues (of manifest variety)
    • DIRC reference signal found in the stand alone configuration
    • Alarms for FDC HV
    • TAGM translation table
    • Data corruption issue in the beginning of the run.
    • rcdb event number issue.
  3. Task for today
    • Setting up high current test (Sasha)
    • CPP test crash (Dave)
  4. Plan for later

Friday, Dec 13 at 08:45

  1. Last 24h:
    • DIRC Gem data beam center configuration collected additional 5M trigger (6m triggers in total).
    • The CPP test (1 hour) run was completed
    • Overnight collected ~3 hours of DIRC commissioning data.
      • Diamond 0/90 Para/Perp & AMO at 150nA current, coherent peak at 8.6 GeV
    • 30 mins Raw mode data taken:
  2. Issues:
  3. Task for today
    • Hall Work
      • Relocate GEM/TRD
      • Installing additional flash module (Sasha)
    • Setting up high current test? (Sasha)
    • TOF: Beni
    • Profiler & FCal prototype: Ashark & Vlad
    • Low current ~3nA run (1 hour)? (Sasha)
  4. Plan for later


Monday, Dec 16 at 08:45

  1. Weekend running:
    • DIRC Gem data beam left configuration collected additional 6M trigger.
    • High rate trigger test completed
      • Bottle neck: DIRC at 250-300 nA.
      • Sasha is preparing a special trigger configuration
    • DIRC commissioning data:
    • Nominal configuration (Moroc threshold=100)~3B triggers
    • Moroc threshold=50 ~ 2B trigger (this weekend)
  2. Issues
  3. Task for today
    • Hall Work
      • Relocate GEM/TRD to beam right position
      • Installing additional flash module (Sasha)
  4. Plan for later