Difference between revisions of "Run Planning Meeting Notes, Dec 12-Dec 20, 2019"
From GlueXWiki
(→Wednesday, Dec 11 at 08:45) |
(→Thursday, Dec 12 at 08:45) |
||
Line 28: | Line 28: | ||
#* DIRC Gem data beam center configuration collected additional 5M trigger (6m triggers in total). | #* DIRC Gem data beam center configuration collected additional 5M trigger (6m triggers in total). | ||
#* The CPP test (1 hour) run was completed | #* The CPP test (1 hour) run was completed | ||
− | #* Overnight collected ~3 hours of DIRC commissioning data. | + | #* Overnight collected ~3 hours of DIRC commissioning data. |
+ | #** Diamond 0/90 Para/Perp & AMO at 150nA current, coherent peak at 8.6 GeV | ||
#* 30 mins Raw mode data taken: | #* 30 mins Raw mode data taken: | ||
#** hd_root crash: https://logbooks.jlab.org/entry/3752755 | #** hd_root crash: https://logbooks.jlab.org/entry/3752755 | ||
− | # | + | # Issues: |
− | + | ||
#* DAQ crash | #* DAQ crash | ||
#* DIRC reference signal found in the stand alone configuration | #* DIRC reference signal found in the stand alone configuration |
Revision as of 09:34, 13 December 2019
Thursday, Dec 12 at 08:45
- Last 24h:
- DIRC Gem data beam center data collected 1M trigger
- Diamond 0/90 aligned at 8.6GeV.
- 5 hours of good running overnight (0.8B trigger collected)
- Issue:
- DAQ crash
- DAQ issues (of manifest variety)
- DIRC reference signal found in the stand alone configuration
- Alarms for FDC HV
- TAGM translation table
- Data corruption issue in the beginning of the run.
- rcdb event number issue.
- DAQ crash
- Task for today
- Setting up high current test (Sasha)
- CPP test crash (Dave)
- Plan for later
- No sping dance today. Spin dance maybe on Friday whiteboard
- Monitoring
Thursday, Dec 12 at 08:45
- Last 24h:
- DIRC Gem data beam center configuration collected additional 5M trigger (6m triggers in total).
- The CPP test (1 hour) run was completed
- Overnight collected ~3 hours of DIRC commissioning data.
- Diamond 0/90 Para/Perp & AMO at 150nA current, coherent peak at 8.6 GeV
- 30 mins Raw mode data taken:
- hd_root crash: https://logbooks.jlab.org/entry/3752755
- Issues:
- DAQ crash
- DIRC reference signal found in the stand alone configuration
- TAGM translation table
- Data corruption issue in the beginning of the run.
- rcdb event number issue.
- Monitoring anomaly observed by Alex:
- ST Timing: https://logbooks.jlab.org/entry/3752783
- normalization to amorphous run for beam monitoring in rootspy updated: https://logbooks.jlab.org/entry/3752755
- Task for today
- Hall Work
- Relocate GEM/TRD
- Installing additional flash module
- Setting up high current test? (Sasha)
- Hall Work
- Plan for later
- Spin dance no longer scheduled
- Potential Hall C path change on Tuesday (Change GEM/TRD position again)
- whiteboard
- Monitoring