= Wednesday, August 31 =
 +
=== Past 24 hours ===
 +
* [https://logbooks.jlab.org/entry/4035734 TAGM HV scan] (Richard)
 +
** Beam profiler used instead of AC
 +
* [https://logbooks.jlab.org/entry/4035729 AC] (Nick & Richard)
 +
* [https://logbooks.jlab.org/entry/4035702 Solenoid B-field ramp down at 10 am] and [https://logbooks.jlab.org/entry/4035750]
 +
* [https://logbooks.jlab.org/entry/4035708 Rate stability during empty target production run] (Sasha)
 +
* CCAL behavior: [https://logbooks.jlab.org/entry/4035864 scalers] & [https://logbooks.jlab.org/entry/4035858 temperature] (Sasha)
 +
* [https://logbooks.jlab.org/entry/4035863 Production runs stop at 9 am] (Sasha)
 +
* More details can be found here
 +
** [https://logbooks.jlab.org/entry/4035945 0400-1000 31/08]
 +
** [https://logbooks.jlab.org/entry/4035879 2200-0400 30-31/08]
 +
** [https://logbooks.jlab.org/entry/4035773 1600-2200 30/08]
 +
** [https://logbooks.jlab.org/entry/4035704 1000-1600 30/08]
 +
** [https://logbooks.jlab.org/entry/4035239 0400-1000 30/08]
 +
 +
=== Issues ===
 +
* AC (Richard)
 +
* Beam Profiler, [https://logbooks.jlab.org/entry/4035813 y-position is noisy & drifting] -> switch off HV wait for a couple minutes, turn HV on (Hovanes)
 +
* [https://logbooks.jlab.org/entry/4035722 SC] and [https://logbooks.jlab.org/entry/4035800 3 missing channels] (Beni)
 +
 +
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===
 +
* Insert Be target
 +
* [https://logbooks.jlab.org/entry/4035974 Replace 5 FCAL bases] (Mark & Malte)
 +
* Electric work
 +
** AC (Nick)
 +
** SC (Nick)
 +
* Take data with B-field
 +
** Trigger study (Sasha)
 +
** Detector checkout (raw mode for ADCs & pi0 for FCAL)
 +
** Physics production
 +
 +
= Tuesday, August 30 =
 +
=== Past 24 hours ===
 +
* Finish CCAL HV calibration (snake scan)
 +
* Data production: empty Be target ~0.4B evts [https://logbooks.jlab.org/entry/4035538] (Sasha)
 +
* More details can be found here:
 +
** [https://logbooks.jlab.org/entry/4035644 0400-1000 30/08]
 +
** [https://logbooks.jlab.org/entry/4035563 2200-0400 29-30/08]
 +
** [https://logbooks.jlab.org/entry/4035487 1600-2200 29/08]
 +
** [https://logbooks.jlab.org/entry/4035321 1000-1600 29/08]
 +
** [https://logbooks.jlab.org/entry/4035239 0400-1000 29/08]
 +
 +
=== Issues ===
 +
* [https://logbooks.jlab.org/entry/4035665 Hydra]
 +
* FCAL bases, 3 FCAL bases need to be replaced
 +
* CDC HV, problem HVBs I-1 and 26 (Naomi & Nick)
 +
* [https://logbooks.jlab.org/entry/4035611 Y position beam instability] (Churamani)
 +
** [https://logbooks.jlab.org/entry/4035628 Ext6Orb Lock turned OFF](Kiarra)
 +
** [https://logbooks.jlab.org/entry/4035629 Lock Config vs. Hall D Vertical Orbit Drift] (Eric)
 +
* AC (Nick)
 +
 +
=== Plan ===
 +
* TAGM calibration after this meeting (Richard)
 +
* Access around 10:30 am in the calorimeter cave to repair AC (Nick)
 +
* Take data until 6 pm
 +
* At 6 pm turn off Bfield and take empty Be target data for one shift w/o Bfield
  
 
= Monday, August 29 =
 
= Monday, August 29 =
Line 14: Line 72:
 
* Beam restoration took 2 hours
 
* Beam restoration took 2 hours
 
* No radiation study was done as advised by A. Deur
 
* No radiation study was done as advised by A. Deur
* CCAL snake scan with HallC bleedthrough beam
+
* CCAL snake scan with HallC bleedthrough beam [https://logbooks.jlab.org/entry/4034502][https://logbooks.jlab.org/entry/4035117] (Drew/Sasha)
* TAC run with cell (-4,4)
+
* Bleedthrough was stable, no beam only for 6 hours on Sunday
 +
* TAC run with cell (-4,4) and HallC bleedthrough beam (Sasha)
 +
* Data production, [https://logbooks.jlab.org/entry/4035163 Be empty target]
 
* More details can be found here:
 
* More details can be found here:
**
+
** [https://logbooks.jlab.org/entry/4035239 0400-1000 29/08]
**
+
** [https://logbooks.jlab.org/entry/4035176 2200-0400 28-29/08]
**
+
** [https://logbooks.jlab.org/entry/4035100 1600-2200 28/08]
 +
** [https://logbooks.jlab.org/entry/4034979 1000-1600 28/08]
 +
** [https://logbooks.jlab.org/entry/4034887 0400-1000 28/08]
 +
** [https://logbooks.jlab.org/entry/4034783 2200-0400 27-28/08]
 +
** [https://logbooks.jlab.org/entry/4034687 1600-2200 27/08]
 +
** [https://logbooks.jlab.org/entry/4034575 1000-1600 27/08]
 +
** [https://logbooks.jlab.org/entry/4034509 0400-1000 27/08]
 +
** [https://logbooks.jlab.org/entry/4034300 2200-0400 26-27/08]
 +
** [https://logbooks.jlab.org/entry/4034209 1600-2200 26/08]
 +
** [https://logbooks.jlab.org/entry/4034121 1000-1600 26/08]
  
 
=== Issues ===
 
=== Issues ===
* AC not working high gain
+
* RootSpy not working
 +
* AC not working at high gain (Nick) [https://logbooks.jlab.org/entry/4034297]
 
* CDC, problem HVBs I-1 and 26 (Naomi & Nick)
 
* CDC, problem HVBs I-1 and 26 (Naomi & Nick)
* 3 FCAL bases need be replaced
+
* 3 FCAL bases need to be replaced on Wednesday or sooner if opportunistic access is possible (Mark)
* Lost solenoid B-field on Sunday (it took most of the day to ramp up)
+
* Target OVC Pressure (Chris) [https://logbooks.jlab.org/entry/4034306][https://logbooks.jlab.org/entry/4034342][https://logbooks.jlab.org/entry/4034728][https://logbooks.jlab.org/entry/4034806]
 +
* Lost solenoid B-field on Sunday (Tim) [https://logbooks.jlab.org/entry/4035005] (it took most of the day to ramp up) [https://logbooks.jlab.org/entry/4035048]
 +
* Tagger dump water flow, settings needed to be adjusted to new conditions?
  
 
=== Plan ===
 
=== Plan ===
 +
* TAGM calibration (Richard)
 +
* Debug AC (Nick)
 +
* PS harp scan (Hovanes or shift crew)
 +
* Empty target run (shift crew)
 +
* Wednesday might be devoted to RF recovery/beam study, so halls access might be possible this day
  
 
= Friday, August 26 =
 
= Friday, August 26 =

Latest revision as of 09:44, 31 August 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Wednesday, August 31

Past 24 hours

Issues

Plan

  • Insert Be target
  • Replace 5 FCAL bases (Mark & Malte)
  • Electric work
    • AC (Nick)
    • SC (Nick)
  • Take data with B-field
    • Trigger study (Sasha)
    • Detector checkout (raw mode for ADCs & pi0 for FCAL)
    • Physics production

Tuesday, August 30

Past 24 hours

Issues

Plan

  • TAGM calibration after this meeting (Richard)
  • Access around 10:30 am in the calorimeter cave to repair AC (Nick)
  • Take data until 6 pm
  • At 6 pm turn off Bfield and take empty Be target data for one shift w/o Bfield

Monday, August 29

Past 72 hours

Issues

  • RootSpy not working
  • AC not working at high gain (Nick) [5]
  • CDC, problem HVBs I-1 and 26 (Naomi & Nick)
  • 3 FCAL bases need to be replaced on Wednesday or sooner if opportunistic access is possible (Mark)
  • Target OVC Pressure (Chris) [6][7][8][9]
  • Lost solenoid B-field on Sunday (Tim) [10] (it took most of the day to ramp up) [11]
  • Tagger dump water flow, settings needed to be adjusted to new conditions?

Plan

  • TAGM calibration (Richard)
  • Debug AC (Nick)
  • PS harp scan (Hovanes or shift crew)
  • Empty target run (shift crew)
  • Wednesday might be devoted to RF recovery/beam study, so halls access might be possible this day

Friday, August 26

Past 24 hours

Issues

Plan

Thursday, August 25

Past 24 hours

Issues

Plan

  • Be ready for beam tomorrow at noon

The hot checkout page

Readiness Check List

  • Solenoid (Eugene/Beni)
    • Start the run with magnetic field on
  • Surveys (Tim/Mark)
    • FCAL survey
    • TOF survey
    • ST survey
    • TAGM
    • TAGH
    • Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)
    • Survey CCAL after it's installed in the Hall
  • DAQ (Sergei).
    • Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change.
  • Trigger (Alex S.)
    • Check physics triggers
    • Run CCAL trigger when the detector is installed in the Hall
    • Connect / check CCAL LED and alpha triggers
  • Beam line
    • Install He beam pipe between FCAL and CCAL (Tim)
    • Install led shielding wall in front downstream the PS (Tim)
    • Radiator status
      • Check amorphous radiator
    • Tagger hodoscope (A. Somov)
      • Install plates with TAGH counters
      • Install / check repaired TAGH countes
    • Tagger microscope (Tim / Richard Jones)
      • Move TAGM to the new location and rotate
    • Collimator Motion (Hovanes)
      • Not changed
    • Active collimator detectors(Richard Jones/Alexandre Deur)
      • Move active collimator to 5 mm hole
      • Check
    • Profiler (Hovanes)
      • Not changed
    • Luminosity monitor (Hovanes)
      • Not changed
    • Halo monitors
      • Not changed
    • PS system (Alex Somov)
      • Not changed
    • Beam line magnets (PS magnet sweeping magnet and tagger quads).
      • Change filed of the PS magnet
    • Polarimeter (Sebastian Cole/M. Dugger)
      • Optional, not used in PrimEx
    • Targets (Chris/Tim/Alexandre D.)
      • LH4
      • Be
    • TAC (Alex Somov/Hovanes)
      • Use CCAL (TAC can be used as a backup)
    • Slow control (Hovanes)
      • Check CCAL
    • RF (Sergei)
      • Not changed
    • Radiation monitors (Alexandre D.)
      • Not changed
  • Detector systems
    • ST (Beni)
      • Connect cables, check dark rate
    • FDC (Lubomir)
      • Not changed
    • CDC (Beni)
      • Move CDC1 crate to the nominal position, cable up
      • Check readout
    • BCal (Mark D. / Elton)
      • Not changed
    • FCal (Mark D.)
      • Check / replace bases if needed
    • ComCal (Alex Somov)
      • Check detector controls (Nick)
      • Install CCAL platform
      • Check platform motion
      • Installed detector on the platform
      • Connect cables
      • Connect LMS
      • Check detector
    • TOF (Beni)
      • Remove inner acrylic absorber