Difference between revisions of "Run Planning Meeting Notes, Apr 26-May 2, 2018"

From GlueXWiki
Jump to: navigation, search
m
Line 5: Line 5:
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 +
 +
== Wednesday, May 2 at 08:45 ==
 +
# Notes from previous 24 hours:
 +
#* Production running
 +
#* Raster scan now working
 +
#* MCC harp scans seem to be fine
 +
# Issues:
 +
# Reports:
 +
# Run Plan
 +
#*Wednesday
 +
#**RF recovery
 +
#**12 GeV Inauguration(!) Tour
 +
#** Access to uninstall muon chamber
 +
#** Raster Scan(?)
 +
#*Thursday
 +
#** Raster Scan(?)
 +
#**TAC Run
 +
#*Friday
 +
#**Production Running
 +
#*Longer term run plan/Other items
 +
#**[https://halldweb.jlab.org/wiki/images/5/5f/Spring18_week16.jpg]
 +
#*End of run preparation
 +
#**Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
 +
#**Shutdown list
 +
# AOB
 +
  
 
== Tuesday, May 1 at 08:45 ==
 
== Tuesday, May 1 at 08:45 ==

Revision as of 19:49, 1 May 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Wednesday, May 2 at 08:45

  1. Notes from previous 24 hours:
    • Production running
    • Raster scan now working
    • MCC harp scans seem to be fine
  2. Issues:
  3. Reports:
  4. Run Plan
    • Wednesday
      • RF recovery
      • 12 GeV Inauguration(!) Tour
      • Access to uninstall muon chamber
      • Raster Scan(?)
    • Thursday
      • Raster Scan(?)
      • TAC Run
    • Friday
      • Production Running
    • Longer term run plan/Other items
    • End of run preparation
      • Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
      • Shutdown list
  5. AOB


Tuesday, May 1 at 08:45

  1. Notes from previous 24 hours:
    • Accesses during beam studies
    • Resuming production running
    • MCC harp scans should be in tune mode
  2. Issues:
    • High-Level Monitoring [5]
    • Occupancies in tagger monitoring [6]
  3. Reports:
  4. Run Plan
    • Tuesday
      • Production Running
      • Raster Scan Studies
    • Wednesday
      • RF recovery
      • 12 GeV Inauguration(!) Tour
      • Access to uninstall muon chamber
    • Thursday
      • TAC Run
    • Longer term run plan/Other items
    • End of run preparation
      • Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
      • Shutdown list
  5. AOB

Monday, April 30 at 08:45

  1. Notes from the weekend:
    • Production running
    • Vertical beam position [8][9][10]
    • Monitoring Plots [11]
  2. Issues:
    • TOF voltage failure [12]
    • Gluon49 failure
    • Open Door
  3. Reports:
  4. Run Plan
    • Monday
      • Beam studies
      • Accesses
        • TOF
        • FCal
        • Muon Chamber
    • Tuesday
      • RF recovery (moved to Wednesday)
    • Wednesday
      • 12 GeV Inauguration(!) Tour
      • TAC Run (Move to Thursday?)
    • Longer term run plan/Other items
      • Resumption of raster scan studies
    • End of run preparation
      • Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
  5. AOB

Sunday, April 29 - No Meeting

Saturday, April 28 - No Meeting

Friday, April 27 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
    • Rootspy crashes and recovery [23][24]
    • Time differences in monitoring plots [25]
  3. Reports:
  4. Run Plan
    • Friday
      • High rate DAQ tests (9.30 am)
      • Injector recovery (MCC, possible beam down ~1hr)
      • Level 1 trigger studies
    • Saturday
      • Production Running
    • Sunday
      • Production Running
    • Longer term run plan/Other items
      • Resumption of raster scan studies
      • Access for Muon detector
      • Tour
      • TAC Run (Wednesday)
    • End of run preparation
      • Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
  5. AOB

Thursday, April 26 at 08:45

  1. Notes from the previous 24 hours:
    • Replacement of TAGH FDC module [28]
    • Production running
    • High rate trigger tests
  2. Issues:
    • Resuming DAQ after Wednesday tour [29]
    • Running with 750 um converter
    • Hot Channels, delta t offsets [30]
  3. Reports:
  4. Run Plan
    • Thursday
      • Level 1 trigger test
      • High rate trigger test part II(?)
      • Low current BPM lock test (afternoon)
    • Friday
      • High rate DAQ tests (9.30 am)
      • TAC Run (2 pm)
    • Saturday
    • Longer term run plan
  5. AOB