Difference between revisions of "Run Planning Meeting Notes, Apr 19-Apr 25, 2018"
From GlueXWiki
(→Thursday, April 19 at 08:45) |
|||
Line 5: | Line 5: | ||
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] | ||
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | ||
+ | |||
+ | == Friday, April 20 at 08:45 == | ||
+ | # Notes from the previous 24 hours: | ||
+ | #* [https://logbooks.jlab.org/entry/3563497 Moved AC to 5 mm hole, installed 100 um W shield] | ||
+ | #* Production running | ||
+ | # Reports: | ||
+ | # Issues | ||
+ | #* [https://logbooks.jlab.org/entry/3563798 Issues with BCAL timing?] (Elton) | ||
+ | # Run Plan | ||
+ | #* High rate tests this afternoon | ||
+ | #* Production running | ||
+ | #* Fast raster scan deferred until Monday (probably, will hear from PD) | ||
+ | #* Longer term run plan | ||
+ | #** [https://halldweb.jlab.org/wiki/images/f/fb/Spring18_week15.jpg weekly plan] | ||
+ | # AOB | ||
+ | |||
== Thursday, April 19 at 08:45 == | == Thursday, April 19 at 08:45 == |
Revision as of 08:31, 20 April 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Friday, April 20 at 08:45
- Notes from the previous 24 hours:
- Moved AC to 5 mm hole, installed 100 um W shield
- Production running
- Reports:
- Issues
- Issues with BCAL timing? (Elton)
- Run Plan
- High rate tests this afternoon
- Production running
- Fast raster scan deferred until Monday (probably, will hear from PD)
- Longer term run plan
- AOB
Thursday, April 19 at 08:45
- Notes from the previous 24 hours:
- Convergence was adjusted
- Current scan completed
- Production running
- Issues:
- Reports:
- Results from material scan (Sergey and Lubomir)
- Results from thin diamond, 3.4 mm hole. FDC currents drop, not CDC PS flux comparison PS enhancement increases
- First results from current scan [1] [2] [3]
- CDC current correlation with Y beam position observed again (Beni)
- Run Plan
- Access today to
- Move active collimator to 5 mm hole
- Attach Pb radiator to profiler
- Muon chamber inspection
- Production running
- Harp scan when beam comes back
- Fast raster scan deferred until the required people can be found
- Future studies
- Access today to
- AOB