Run Planning Meeting Notes, Apr5-Apr 11, 2018

From GlueXWiki
Revision as of 08:10, 6 April 2018 by Davidl (Talk | contribs)

Jump to: navigation, search

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, April 5 at 08:45

  1. Notes from the previous 24 hours:
    • Beam convergence adjustment by Todd
    • Beam issues off and on through Swing and Owl shifts
    • fADC125 module failure in FDC. Rapid access used by Sascha and Cody to replace.
    • Other DAQ issues ~1hr for swing + owl
  2. Issues:
    • Shift-takers should at least log any acknowledged alarms so that they are not forgotten
      • TAGH had few tripped channels with no alarm sounding
    • High Level monitoring plots look bad (calibrations)
    • Bubblers
  3. Reports:
  4. Run Plan
    • TAC run using V-wire today (pending good AC lock)
    • Production Running
  5. AOB

Friday, April 6 at 08:45

  1. Notes from the previous 24 hours:
    • Some issues getting stable beam through the day except for ~1hr over lunch
    • V-wire setup late afternoon
    • TAC/PS efficiency tests
    • Beam issues off and on through Swing and Owl shifts
    • fADC125 module failure in FDC. Rapid access used by Sascha and Cody to replace.
    • Other DAQ issues ~1hr for swing + owl
  2. Issues:
    • Shift-takers should at least log any acknowledged alarms so that they are not forgotten
      • TAGH had few tripped channels with no alarm sounding
    • High Level monitoring plots look bad (calibrations)
    • Bubblers
  3. Reports:
  4. Run Plan
    • TAC run using V-wire today (pending good AC lock)
    • Production Running

3 month down period run to may 6

  1. AOB

Saturday, April 7 at 10:00

--- NO MEETING ---

Sunday, April 8 at 10:00

Monday, April 9 at 08:45

Tuesday, April 10 at 08:45

Wednesday, April 11 at 08:45