Difference between revisions of "Run Planning Meeting Notes, Apr5-Apr 11, 2018"
From GlueXWiki
(Created page with "<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run * [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2018-01/index.html Trigger graphs] * [h...") |
|||
Line 26: | Line 26: | ||
== Friday, April 6 at 08:45 == | == Friday, April 6 at 08:45 == | ||
+ | # Notes from the previous 24 hours: | ||
+ | #* Some issues getting stable beam through the day except for ~1hr over lunch | ||
+ | #* V-wire setup late afternoon | ||
+ | #* TAC/PS efficiency tests | ||
+ | #* Beam issues off and on through Swing and Owl shifts | ||
+ | #* fADC125 module failure in FDC. Rapid access used by Sascha and Cody to replace. | ||
+ | #* Other DAQ issues ~1hr for swing + owl | ||
+ | #Issues: | ||
+ | #* Shift-takers should at least log any acknowledged alarms so that they are not forgotten | ||
+ | #** TAGH had few tripped channels with no alarm sounding | ||
+ | #* High Level monitoring plots look bad (calibrations) | ||
+ | #* [https://logbooks.jlab.org/entry/3555160 Bubblers] | ||
+ | # Reports: | ||
+ | #* [https://logbooks.jlab.org/entry/3555238 Low Level Monitoring Report] | ||
+ | #* [https://logbooks.jlab.org/entry/3554935 750 um Be] | ||
+ | # Run Plan | ||
+ | #* TAC run using V-wire today (pending good AC lock) | ||
+ | #* Production Running | ||
+ | 3 month down period | ||
+ | run to may 6 | ||
+ | # AOB | ||
+ | |||
== Saturday, April 7 at 10:00 == | == Saturday, April 7 at 10:00 == | ||
''--- NO MEETING ---'' | ''--- NO MEETING ---'' |
Revision as of 08:10, 6 April 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Thursday, April 5 at 08:45
- Notes from the previous 24 hours:
- Beam convergence adjustment by Todd
- Beam issues off and on through Swing and Owl shifts
- fADC125 module failure in FDC. Rapid access used by Sascha and Cody to replace.
- Other DAQ issues ~1hr for swing + owl
- Issues:
- Shift-takers should at least log any acknowledged alarms so that they are not forgotten
- TAGH had few tripped channels with no alarm sounding
- High Level monitoring plots look bad (calibrations)
- Bubblers
- Shift-takers should at least log any acknowledged alarms so that they are not forgotten
- Reports:
- Run Plan
- TAC run using V-wire today (pending good AC lock)
- Production Running
- AOB
Friday, April 6 at 08:45
- Notes from the previous 24 hours:
- Some issues getting stable beam through the day except for ~1hr over lunch
- V-wire setup late afternoon
- TAC/PS efficiency tests
- Beam issues off and on through Swing and Owl shifts
- fADC125 module failure in FDC. Rapid access used by Sascha and Cody to replace.
- Other DAQ issues ~1hr for swing + owl
- Issues:
- Shift-takers should at least log any acknowledged alarms so that they are not forgotten
- TAGH had few tripped channels with no alarm sounding
- High Level monitoring plots look bad (calibrations)
- Bubblers
- Shift-takers should at least log any acknowledged alarms so that they are not forgotten
- Reports:
- Run Plan
- TAC run using V-wire today (pending good AC lock)
- Production Running
3 month down period run to may 6
- AOB
Saturday, April 7 at 10:00
--- NO MEETING ---