(Monday, April 16 at 08:45)
(Monday, April 16 at 08:45)
Line 76: Line 76:
 
#Reports
 
#Reports
 
#*[https://logbooks.jlab.org/entry/3560188 New preamp (and calibration) fixes noisy CDC channels] (Naomi)
 
#*[https://logbooks.jlab.org/entry/3560188 New preamp (and calibration) fixes noisy CDC channels] (Naomi)
#*[https://logbooks.jlab.org/entry/3560023], [https://logbooks.jlab.org/entry/3560036] Figure of merit vs. virtual electron spot size (Justin)
+
#*[https://logbooks.jlab.org/entry/3560023], [https://logbooks.jlab.org/entry/3560036], [https://logbooks.jlab.org/entry/3560023 (Revised entry)] Figure of merit vs. virtual electron spot size (Justin)
 
#*[https://logbooks.jlab.org/entry/3561136 Sunday's harp scan] (Hovanes)
 
#*[https://logbooks.jlab.org/entry/3561136 Sunday's harp scan] (Hovanes)
 
#* [https://logbooks.jlab.org/entry/3561327 PS baselines adjusted] (Sasha)
 
#* [https://logbooks.jlab.org/entry/3561327 PS baselines adjusted] (Sasha)
Line 88: Line 88:
 
#** Switch AC to 3.5 mm collimator
 
#** Switch AC to 3.5 mm collimator
 
#*** Take data through Thurs. with this setting: 150 nA, 75 micron converter, 0/90, AMO
 
#*** Take data through Thurs. with this setting: 150 nA, 75 micron converter, 0/90, AMO
 +
#*** proper beam tuning?
 
#* Best time to try to try the low current lock on the AC for the next TAC run? Tentatively postponed until Wed. before raster tests
 
#* Best time to try to try the low current lock on the AC for the next TAC run? Tentatively postponed until Wed. before raster tests
  

Revision as of 08:40, 16 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, April 12 at 08:45

  1. Notes from the previous 24 hours:
    • TAC run (evening strip chart) was finished around 10pm. Took data with both the 750um and 75um converter.
    • Production started around 11 pm and has continued through the night.
  2. Issues:
    • When adjusting a procedure, please contact the expert before doing so to make sure the changes you make are okay.
    • ~1hr 20 mins of DAQ issues while the target was filling and we could not run in raw mode.
    • PS scalers (Alexandre)
  1. Reports:
  2. Run Plan
    • Pass change this morning
      • Short access to install copper and tungsten shields
      • Move muon chamber back into beam line
    • Production running
      • Harp scan when beam comes back
    • Fast raster scan postponed to Monday
    • Any more systematic studies we want to do?
  3. AOB

Friday, April 13 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
    • Bill noticed some minor inconsistencies with monitoring plots (beta vs. p, beam energy, and trigger bit)
  3. Reports:
  4. Run Plan
  1. AOB
    • Have Lubomir for opportunistic access to remove Cu and half of W shield- any others? Beam studies on Monday and RF recovery Tuesday
    • Run meeting this weekend?

Saturday, April 14 at 08:45

No meeting

Sunday, April 15 at 08:45

No meeting

Monday, April 16 at 08:45

  1. Notes from the previous 48 hours:
  1. Issues:
  2. Reports
  3. Run Plan
    • 8hr beam studies today
      • Controlled access to adjust shielding, replace AC voltage adapter, FCAL bases, and other technician work
    • Finish materials scan
    • Production this evening
    • RF recovery tomorrow
      • Switch AC to 3.5 mm collimator
        • Take data through Thurs. with this setting: 150 nA, 75 micron converter, 0/90, AMO
        • proper beam tuning?
    • Best time to try to try the low current lock on the AC for the next TAC run? Tentatively postponed until Wed. before raster tests
  1. AOB

Tuesday, April 17 at 08:45

Wednesday, April 18 at 08:45