Difference between revisions of "Run Planning Meeting Notes, Apr12-Apr 18, 2018"

From GlueXWiki
Jump to: navigation, search
(Friday, April 13 at 08:45)
(Friday, April 13 at 08:45)
Line 43: Line 43:
 
#* [https://logbooks.jlab.org/entry/3559655 Harp scan] (Hovanes)
 
#* [https://logbooks.jlab.org/entry/3559655 Harp scan] (Hovanes)
 
#* [https://logbooks.jlab.org/entry/3559691 Materials scan] (Lubomir)
 
#* [https://logbooks.jlab.org/entry/3559691 Materials scan] (Lubomir)
 +
#* [https://logbooks.jlab.org/entry/3559958 Low level monitoring] (Thomas)
 
# Run Plan
 
# Run Plan
 
#* [https://halldweb.jlab.org/wiki/index.php/File:Spring18_week14.jpg Production]
 
#* [https://halldweb.jlab.org/wiki/index.php/File:Spring18_week14.jpg Production]
Line 48: Line 49:
 
# AOB
 
# AOB
 
#* Have Lubomir for opportunistic access to remove Cu and half of W shield- any others? Beam studies on Monday
 
#* Have Lubomir for opportunistic access to remove Cu and half of W shield- any others? Beam studies on Monday
 +
#* Run meeting this weekend?
  
 
== Saturday, April 14 at 08:45 ==
 
== Saturday, April 14 at 08:45 ==

Revision as of 07:00, 13 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, April 12 at 08:45

  1. Notes from the previous 24 hours:
    • TAC run (evening strip chart) was finished around 10pm. Took data with both the 750um and 75um converter.
    • Production started around 11 pm and has continued through the night.
  2. Issues:
    • When adjusting a procedure, please contact the expert before doing so to make sure the changes you make are okay.
    • ~1hr 20 mins of DAQ issues while the target was filling and we could not run in raw mode.
    • PS scalers (Alexandre)
  1. Reports:
  2. Run Plan
    • Pass change this morning
      • Short access to install copper and tungsten shields
      • Move muon chamber back into beam line
    • Production running
      • Harp scan when beam comes back
    • Fast raster scan postponed to Monday
    • Any more systematic studies we want to do?
  3. AOB

Friday, April 13 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Run Plan
    • Production
    • Trigger studies (~2hr) and Hovanes and Sasha need to test V wire and lock on active collimater (~10 minutes)
  5. AOB
    • Have Lubomir for opportunistic access to remove Cu and half of W shield- any others? Beam studies on Monday
    • Run meeting this weekend?

Saturday, April 14 at 08:45

Sunday, April 15 at 08:45

Monday, April 16 at 08:45

Tuesday, April 17 at 08:45

Wednesday, April 18 at 08:45