Difference between revisions of "Run Planning Meeting Notes, Apr12-Apr 18, 2018"

From GlueXWiki
Jump to: navigation, search
(Thursday, April 12 at 08:45)
(Friday, April 13 at 08:45)
Line 32: Line 32:
 
== Friday, April 13 at 08:45 ==
 
== Friday, April 13 at 08:45 ==
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
#*  
+
#* [https://logbooks.jlab.org/entry/3559451 Muon chamber installed with the steel bar]
 +
#* [https://logbooks.jlab.org/entry/3559446 New radiator on GEM TRD]
 +
#* [https://logbooks.jlab.org/entry/3559412 Shields installed on profiler]
 
#Issues:
 
#Issues:
 
#*  
 
#*  
 
# Reports:  
 
# Reports:  
#*  
+
#*
 
# Run Plan
 
# Run Plan
 
#*  
 
#*  

Revision as of 11:55, 12 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, April 12 at 08:45

  1. Notes from the previous 24 hours:
    • TAC run (evening strip chart) was finished around 10pm. Took data with both the 750um and 75um converter.
    • Production started around 11 pm and has continued through the night.
  2. Issues:
    • When adjusting a procedure, please contact the expert before doing so to make sure the changes you make are okay.
    • ~1hr 20 mins of DAQ issues while the target was filling and we could not run in raw mode.
    • PS scalers (Alexandre)
  1. Reports:
  2. Run Plan
    • Pass change this morning
      • Short access to install copper and tungsten shields
      • Move muon chamber back into beam line
    • Production running
      • Harp scan when beam comes back
    • Fast raster scan postponed to Monday
    • Any more systematic studies we want to do?
  3. AOB

Friday, April 13 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Run Plan
  5. AOB

Saturday, April 14 at 08:45

Sunday, April 15 at 08:45

Monday, April 16 at 08:45

Tuesday, April 17 at 08:45

Wednesday, April 18 at 08:45