(Thursday, April 12 at 08:45)
(Thursday, April 12 at 08:45)
Line 8: Line 8:
 
== Thursday, April 12 at 08:45 ==
 
== Thursday, April 12 at 08:45 ==
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
#* TAC run ([https://logbooks.jlab.org/entry/3558999 example strip chart])
+
#* TAC run ([https://logbooks.jlab.org/entry/3559119 evening strip chart]) was finished around 10pm. Took data with both the 750um and 75um converter.
#* Raw mode running while target is filling
+
#* Production started around 11 pm and has continued through the night.
#* Production
+
 
#Issues:
 
#Issues:
#*  
+
#* When adjusting a procedure, please contact the expert before doing so to make sure the changes you make are okay.
 +
#* ~1hr 20 mins of DAQ issues while the target was filling and we could not run in raw mode.
 
# Reports:
 
# Reports:
 
#* [https://logbooks.jlab.org/entry/3558945 Correlation between beam Y position and CDC HV current] (Beni)
 
#* [https://logbooks.jlab.org/entry/3558945 Correlation between beam Y position and CDC HV current] (Beni)
 
#* [https://logbooks.jlab.org/entry/3559014 Attenuation lengths] (Lubomir)
 
#* [https://logbooks.jlab.org/entry/3559014 Attenuation lengths] (Lubomir)
 +
#* [https://logbooks.jlab.org/entry/3559057 PS acceptance from TAC run with 1/3 of data] (Sasha)
 
#* [Low Level Monitoring Report]
 
#* [Low Level Monitoring Report]
 
# Run Plan
 
# Run Plan
 
#* Pass change this morning
 
#* Pass change this morning
#** Short access to install copper and tungsten plates
+
#** Short access to install copper and tungsten shields
 
#* Production Running
 
#* Production Running
 
#* Fast raster scan postponed to Monday
 
#* Fast raster scan postponed to Monday

Revision as of 05:10, 12 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, April 12 at 08:45

  1. Notes from the previous 24 hours:
    • TAC run (evening strip chart) was finished around 10pm. Took data with both the 750um and 75um converter.
    • Production started around 11 pm and has continued through the night.
  2. Issues:
    • When adjusting a procedure, please contact the expert before doing so to make sure the changes you make are okay.
    • ~1hr 20 mins of DAQ issues while the target was filling and we could not run in raw mode.
  3. Reports:
  4. Run Plan
    • Pass change this morning
      • Short access to install copper and tungsten shields
    • Production Running
    • Fast raster scan postponed to Monday
  5. AOB

Friday, April 13 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Run Plan
  5. AOB

Saturday, April 14 at 08:45

Sunday, April 15 at 08:45

Monday, April 16 at 08:45

Tuesday, April 17 at 08:45

Wednesday, April 18 at 08:45