(Thursday, April 12 at 08:45)
(Thursday, April 12 at 08:45)
Line 14: Line 14:
 
#*  
 
#*  
 
# Reports:
 
# Reports:
#* [https://logbooks.jlab.org/entry/3558945] Correlation between beam Y position and CDC HV current] (Beni)
+
#* [https://logbooks.jlab.org/entry/3558945 Correlation between beam Y position and CDC HV current] (Beni)
 
#* [https://logbooks.jlab.org/entry/3555238 Low Level Monitoring Report]
 
#* [https://logbooks.jlab.org/entry/3555238 Low Level Monitoring Report]
 
# Run Plan
 
# Run Plan

Revision as of 17:17, 11 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, April 12 at 08:45

  1. Notes from the previous 24 hours:
    • TAC run
    • Raw mode running while target is filling
    • Production
  2. Issues:
  3. Reports:
  4. Run Plan
    • Pass change this morning
      • Short access to install copper and tungsten plates
    • Production Running
  5. AOB

Friday, April 13 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Run Plan
  5. AOB

Saturday, April 14 at 08:45

Sunday, April 15 at 08:45

Monday, April 16 at 08:45

Tuesday, April 17 at 08:45

Wednesday, April 18 at 08:45