Difference between revisions of "Run Planning Meeting Noters, November 9- November 16, 2022"
From GlueXWiki
(→Past 24 hours) |
(→Past 24 hours) |
||
Line 13: | Line 13: | ||
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues. | * No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues. | ||
− | * Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator | + | * Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates. |
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events. | * Took production data on Full LHe target. Since yesterday we collected 1.0 B events. | ||
Revision as of 09:23, 10 November 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Thursday, November 10
Past 24 hours
- No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.
- Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.
- Took production data on Full LHe target. Since yesterday we collected 1.0 B events.
Shift Summary
Issues/Reports
- No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.
Plan
- Continue with Full target production.