=Wednesday, November 9=
+
=Thursday, November 10=
 
=== Past 24 hours ===
 
=== Past 24 hours ===
  
* Taking production data on Full LHe target whenever we had beam. Since yesterday we collected 1.9 B events. The Total events collected for the Full target since we filled it on Saturday so far is 8.0B.
+
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.
 +
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.
 +
* Took production data on Full LHe target. Since yesterday we collected 1.0 B events.
  
 
=== Shift Summary ===
 
=== Shift Summary ===
  
  
* [https://logbooks.jlab.org/entry/4078571 Day Nov 8 ]
+
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]
* [https://logbooks.jlab.org/entry/4078809 Swing Nov 8]
+
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]
* [https://logbooks.jlab.org/entry/4078915 Owl Nov8/9]
+
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]
* [https://logbooks.jlab.org/entry/4079038 Early riser Nov 9]
+
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]
  
 
=== Issues/Reports ===
 
=== Issues/Reports ===
* None
+
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.
 +
* After the beam was back it was mostly stable besides some FSD trips.
  
 
=== Plan ===
 
=== Plan ===
 
 
* Continue with Full target production.
 
* Continue with Full target production.
*Mariana Khachatryan is taking ove RC later Today
+
* Accelerator maintenance scheduled for Tuesday or Wednesday.
  
=Tuesday, November 8=
+
=Friday, November 11=
 
=== Past 24 hours ===
 
=== Past 24 hours ===
* Don't forget to vote!!!
+
* Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753).
* Taking production data on Full LHe target whenever we had beam. Since yesterday we collected 1.9B events
+
* Took production data on Full LHe target. Since yesterday we collected 2.2 B events.
* No beam this morning: [https://logbooks.jlab.org/entry/4078503 vacuum valve problem]
+
 
+
  
 
=== Shift Summary ===
 
=== Shift Summary ===
  
* [https://logbooks.jlab.org/entry/4078127 Day Nov 7 (Mark)]
+
 
*[https://logbooks.jlab.org/entry/4078079 Day Nov 7 (Zisis)]
+
* [https://logbooks.jlab.org/entry/4080022 Day Nov 10 ]
* [https://logbooks.jlab.org/entry/4078232 Swing Nov 7]
+
* [https://logbooks.jlab.org/entry/4080228 Swing Nov 10]
* [https://logbooks.jlab.org/entry/4078375 Owl Nov7/8]
+
* [https://logbooks.jlab.org/entry/4080423 Owl Nov10/11]
* [https://logbooks.jlab.org/entry/4078497 Early riser Nov 8]
+
* [https://logbooks.jlab.org/entry/4080591 Early riser Nov 11]
  
 
=== Issues/Reports ===
 
=== Issues/Reports ===
* Fire alarm control. (Tim already explained it is not a real alarm). at 8:15 am there was a fire alarm in the Fire alarm control. It went away but came back after a couple of minutes. https://logbooks.jlab.org/entry/4078540
+
* MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.
*[https://logbooks.jlab.org/entry/4078512 Alcohol Bubblers Filled]. Thanks Scot!
+
* Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.
  
 
=== Plan ===
 
=== Plan ===
 
 
* Continue with Full target production.
 
* Continue with Full target production.
 +
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.
  
=Monday, November 7=
+
=Saturday, November 12=
=== Past 72 hours ===
+
=== Past 24 hours ===
* Friday. We took production data in empty target all day until Saturday morning. Smooth beam
+
* Took production data on  LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.
* Saturday: ( in general the beam conditions have not been ideal)
+
* The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449).
**  Total accumulated events for all this days doing empty target ~2.6B
+
Since yesterday we collected 1 B events.
**  Day: ~10 am we started filling the target while Sasha
+
* Started running Empty target production whenever we had beam. (No beam for ~4.5 hours for a NL access)
+
  
 
=== Shift Summary ===
 
=== Shift Summary ===
* [https://logbooks.jlab.org/entry/4076528 Day Nov 4 ]
 
* [https://logbooks.jlab.org/entry/4076760 Swing Nov 4]
 
* [https://logbooks.jlab.org/entry/4076892 Owl Nov4/5]
 
* [https://logbooks.jlab.org/entry/4076991 Early riser Nov 5]
 
* [https://logbooks.jlab.org/entry/4077095 Day Nov 5 ]
 
* [https://logbooks.jlab.org/entry/4077240 Swing Nov 5]
 
* [https://logbooks.jlab.org/entry/4077403 Owl Nov5/6 (Luckiest Shift crew of the year!)]
 
* [https://logbooks.jlab.org/entry/4077533 Early riser Nov 6]
 
* [https://logbooks.jlab.org/entry/4077654 Day Nov 6 ]
 
* [https://logbooks.jlab.org/entry/4077771 Swing Nov 6]
 
* [https://logbooks.jlab.org/entry/4077881 Owl Nov6/7]
 
* [https://logbooks.jlab.org/entry/4077974 Early riser Nov 7]
 
  
 +
 +
* [https://logbooks.jlab.org/entry/4080817 Day Nov 11 ]
 +
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 11]
 +
* [https://logbooks.jlab.org/entry/4081215 Owl Nov11/12]
 +
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 12]
  
 
=== Issues/Reports ===
 
=== Issues/Reports ===
*Wednesday when doing the cosmic raw run the FP pulser rate was set to 2kHz and forgot to reset it back to 100Hz afterwards. So we were running with 2kHz the whole time since. Now set back to 100Hz (Beni). -> Sasha said it wasn't a big problem since it didn't change deadtime
+
* SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.
*In general, beam conditions have been really poor. We continued taking data but made sure to mark some of the runs while ACC was troubleshooting problems with the injector.
+
* During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.
* Shift Crew reported:  Need to fill the alcohol bubblers.
+
* After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.
  
 
=== Plan ===
 
=== Plan ===
 +
* Started empty target production when the beam was back.
 +
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.
  
* Continue with Full target production.
+
=Sunday, November 13=
 
+
=Friday, November 4=
+
 
=== Past 24 hours ===
 
=== Past 24 hours ===
* Emptied the target at 9 am. No problems on that
+
* Took production data with empty target.
* Started running Empty target production whenever we had beam. (No beam for ~4.5 hours for a NL access)
+
* Since yesterday we collected 1 B events.
  
 
=== Shift Summary ===
 
=== Shift Summary ===
* [https://logbooks.jlab.org/entry/4075781 Day Nov 3 (Igal)]
+
 
* [https://logbooks.jlab.org/entry/4075858 Day Nov 3 (Beni)]
+
 
* [https://logbooks.jlab.org/entry/4076028 Swing Nov 3]
+
* [https://logbooks.jlab.org/entry/4081637 Day Nov 12 ]
* [https://logbooks.jlab.org/entry/4076311 Owl Nov3/4]
+
* [https://logbooks.jlab.org/entry/4081721 Swing Nov 12]
* [https://logbooks.jlab.org/entry/4076405 Early riser Nov 4]
+
* [https://logbooks.jlab.org/entry/4082073 Owl Nov12/13]
 +
* [https://logbooks.jlab.org/entry/4082274 Early riser Nov 13]
  
 
=== Issues/Reports ===
 
=== Issues/Reports ===
* [https://logbooks.jlab.org/entry/4076018 Alarm in one of the magnets ] (Beni)
+
* It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know.  
* [https://logbooks.jlab.org/entry/4076021 Cycling TAG5C] (Daniel Moser)
+
* BCAL LED triggers still off.
* [https://logbooks.jlab.org/entry/4076377 CDC EPICS showing diconnected] (Arshak/Boris)
+
[https://logbooks.jlab.org/entry/4076382 Hard reboot worked] (Arshak)
+
  
 
=== Plan ===
 
=== Plan ===
 +
* Started empty target production when the beam was back.
 +
* Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.
  
* Continue with empty target production.  
+
=Monday, November 14=
* (Note): Hall B plans to change to a 1/2 wave plate at some point Today.  
+
=== Past 24 hours ===
* After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
+
* Took production data with empty target.
 +
* Since yesterday we collected 0.7 B events.
 +
 
 +
=== Shift Summary ===
 +
 
 +
 
 +
* [https://logbooks.jlab.org/entry/4082389 Day Nov 13 ]
 +
* [https://logbooks.jlab.org/entry/4082601 Swing Nov 13]
 +
* [https://logbooks.jlab.org/entry/4082846 Owl Nov13/14]
 +
* [https://logbooks.jlab.org/entry/4083053 Early riser Nov 14]
 +
 
 +
=== Issues/Reports ===
 +
* Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know.
 +
* 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.
 +
* BCAL LED triggers turned on by Arshak during owl shift.
 +
 
 +
=== Plan ===
 +
* Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.
  
=Thursday, November 3=
+
=Tuesday, November 15=
 
=== Past 24 hours ===
 
=== Past 24 hours ===
* Maintenance day. Got Beam Back in the Swing shift.
+
* Took production data with empty target.
* Harp scans after beam returned. [https://logbooks.jlab.org/entry/4075542] [https://logbooks.jlab.org/entry/4075550]
+
* Since yesterday we collected 1.2 B events.
* Full target production all night whenever we had beam.
+
* Beam has been unstable. Related to issue to reduce HALO counts above 4nA for Hall B.
+
  
 
=== Shift Summary ===
 
=== Shift Summary ===
* [https://logbooks.jlab.org/entry/4075272 Day Nov 2]
+
 
* [https://logbooks.jlab.org/entry/4075445 Swing Nov 2]
+
 
* [https://logbooks.jlab.org/entry/4075588 Owl Nov2/3]
+
* [https://logbooks.jlab.org/entry/4083308 Day Nov 14]
* [https://logbooks.jlab.org/entry/4075669 Early riser Nov 3]
+
* [https://logbooks.jlab.org/entry/4083547 Swing Nov 14]
 +
* [https://logbooks.jlab.org/entry/4083747 Owl Nov14/15]
 +
* [https://logbooks.jlab.org/entry/4083956 Early riser Nov 15]
  
 
=== Issues/Reports ===
 
=== Issues/Reports ===
* [https://logbooks.jlab.org/entry/4075373 FCAL voltage issue and bases replacement] (Malte)
+
* Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.
* Simon was not authorized to add logbook entries when logged into the logbook on gluon02 (??)
+
*Had a really smooth data taking throughout owl and early riser shifts.
  
 
=== Plan ===
 
=== Plan ===
 +
* Accelerator maintenance started at 6:45 am, will last until 2:45 pm.
 +
* Mark and Malte will go into the hall to work on FCAL.
 +
* Beni will fill CDC bubblers
 +
* Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.
 +
* Sasha installing chiller for led tungsten detector prototype.
 +
* Kondo entered the hall to work on PSC GEMs
 +
* Do harp scan after the beam is back and take production data with full target.
  
 +
=Wednesday, November 16=
 +
=== Past 24 hours ===
 +
* Maintenance day, multiple people worked in the hall.
 +
* Did harp scan when the beam was back (23:50 pm). The beam harp scan results look good (https://logbooks.jlab.org/entry/4084755).
 +
* Took production data with full target.
 +
* Since yesterday we collected 0.6 B events.
  
* 9:30 am Empty target, then start production
+
=== Shift Summary ===
* After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
+
 
 +
 
 +
* [https://logbooks.jlab.org/entry/4084136 Day Nov 15]
 +
* [https://logbooks.jlab.org/entry/4084367 Swing Nov 15]
 +
* [https://logbooks.jlab.org/entry/4084451 Owl Nov15/16]
 +
* [https://logbooks.jlab.org/entry/4084615 Early riser Nov 16]
 +
 
 +
=== Issues/Reports ===
 +
* Alex noticed that no new files have been copied to the farm from the counting house since run 111443 from Monday morning. Sergey says that this problem happens occasionally and he will take care of this.
 +
* Sasha found some issues with BCAL LED trigger. The level translation board has a problem that results in producing some extraneous trigger pulses for the downstream led trigger. Will be replaced when there are spare modules.
 +
* The right CO2 and Argon gas supplies look low, also Thomas mentioned that right CO2 canister was making a possibly anomalous buzzing sound.
 +
 
 +
=== Plan ===
 +
* Continue taking production data with full target.
 +
* Igal taking over run coordination at 1:30 pm.
 +
* Hall C plans to do luminosity scan on Thursday with 70 uA, so the beam might become unstable.

Latest revision as of 14:34, 16 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, November 10

Past 24 hours

  • No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.
  • Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.
  • Took production data on Full LHe target. Since yesterday we collected 1.0 B events.

Shift Summary

Issues/Reports

  • No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.
  • After the beam was back it was mostly stable besides some FSD trips.

Plan

  • Continue with Full target production.
  • Accelerator maintenance scheduled for Tuesday or Wednesday.

Friday, November 11

Past 24 hours

  • Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753).
  • Took production data on Full LHe target. Since yesterday we collected 2.2 B events.

Shift Summary

Issues/Reports

  • MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.
  • Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.

Plan

  • Continue with Full target production.
  • Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.

Saturday, November 12

Past 24 hours

  • Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.
  • The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449).

Since yesterday we collected 1 B events.

Shift Summary

Issues/Reports

  • SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.
  • During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.
  • After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.

Plan

  • Started empty target production when the beam was back.
  • Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.

Sunday, November 13

Past 24 hours

  • Took production data with empty target.
  • Since yesterday we collected 1 B events.

Shift Summary

Issues/Reports

  • It was noticed during owl shift that CDC bubbler BA901 was not bubbling, let Beni know.
  • BCAL LED triggers still off.

Plan

  • Started empty target production when the beam was back.
  • Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.

Monday, November 14

Past 24 hours

  • Took production data with empty target.
  • Since yesterday we collected 0.7 B events.

Shift Summary

Issues/Reports

  • Beam very unstable, RF and orbit instabilities. Didn't have beam for few hours. Also beam positions was oscillating during owl and early riser shifts, particularly AC inner Y https://logbooks.jlab.org/entry/4082281. Let MCC know.
  • 2pm Beni says that the CDC bubbler BA901 is bubbling again, it needs some more oil, Beni will add when there is an opportunistic access.
  • BCAL LED triggers turned on by Arshak during owl shift.

Plan

  • Accelerator maintenance scheduled for Tuesday ~6:45 am. Plan to finish around 2:45 pm.

Tuesday, November 15

Past 24 hours

  • Took production data with empty target.
  • Since yesterday we collected 1.2 B events.

Shift Summary

Issues/Reports

  • Beam very unstable, beam/AC position changing a lot. Let MCC know, they turned on the orbit locks and the position at AC became more stable, but beam is very trippy.
  • Had a really smooth data taking throughout owl and early riser shifts.

Plan

  • Accelerator maintenance started at 6:45 am, will last until 2:45 pm.
  • Mark and Malte will go into the hall to work on FCAL.
  • Beni will fill CDC bubblers
  • Physics electricians will enter hall to understand how to organize installment of FCAL2 equipment.
  • Sasha installing chiller for led tungsten detector prototype.
  • Kondo entered the hall to work on PSC GEMs
  • Do harp scan after the beam is back and take production data with full target.

Wednesday, November 16

Past 24 hours

  • Maintenance day, multiple people worked in the hall.
  • Did harp scan when the beam was back (23:50 pm). The beam harp scan results look good (https://logbooks.jlab.org/entry/4084755).
  • Took production data with full target.
  • Since yesterday we collected 0.6 B events.

Shift Summary

Issues/Reports

  • Alex noticed that no new files have been copied to the farm from the counting house since run 111443 from Monday morning. Sergey says that this problem happens occasionally and he will take care of this.
  • Sasha found some issues with BCAL LED trigger. The level translation board has a problem that results in producing some extraneous trigger pulses for the downstream led trigger. Will be replaced when there are spare modules.
  • The right CO2 and Argon gas supplies look low, also Thomas mentioned that right CO2 canister was making a possibly anomalous buzzing sound.

Plan

  • Continue taking production data with full target.
  • Igal taking over run coordination at 1:30 pm.
  • Hall C plans to do luminosity scan on Thursday with 70 uA, so the beam might become unstable.