Difference between revisions of "Run Planning Meeting Noters, November 2- November 9, 2022"

From GlueXWiki
Jump to: navigation, search
(Issues/Reports)
(Shift Summary)
Line 18: Line 18:
 
=== Shift Summary ===
 
=== Shift Summary ===
  
* [https://logbooks.jlab.org/entry/4077654 Day Nov 7 ]
+
* [https://logbooks.jlab.org/entry/4078127 Day Nov 7 (Mark)]
* [https://logbooks.jlab.org/entry/4077771 Swing Nov 7]
+
*[https://logbooks.jlab.org/entry/4078079 Day Nov 7 (Zisis)]
* [https://logbooks.jlab.org/entry/4077881 Owl Nov7/8]
+
* [https://logbooks.jlab.org/entry/4078232 Swing Nov 7]
 +
* [https://logbooks.jlab.org/entry/4078375 Owl Nov7/8]
 
* [https://logbooks.jlab.org/entry/4078497 Early riser Nov 9]
 
* [https://logbooks.jlab.org/entry/4078497 Early riser Nov 9]
 
  
 
=== Issues/Reports ===
 
=== Issues/Reports ===

Revision as of 08:00, 8 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Tuesday, November 8

Past 24 hours

  • Don't forget to vote!!!
  • Taking production data on Full LHe target whenever we had beam.
  • No beam this morning: vacuum valve problem


Shift Summary

Issues/Reports

Plan

  • Continue with Full target production.

Monday, November 7

Past 72 hours

  • Friday. We took production data in empty target all day until Saturday morning. Smooth beam
  • Saturday: ( in general the beam conditions have not been ideal)
    • Total accumulated events for all this days doing empty target ~2.5B
    • Day: ~10 am we started filling the target while Sasha
  • Started running Empty target production whenever we had beam. (No beam for ~4.5 hours for a NL access)

Shift Summary


Issues/Reports

  • Wednesday when doing the cosmic raw run the FP pulser rate was set to 2kHz and forgot to reset it back to 100Hz afterwards. So we were running with 2kHz the whole time since. Now set back to 100Hz (Beni). -> Sasha said it wasn't a big problem since it didn't change deadtime
  • In general, beam conditions have been really poor. We continued taking data but made sure to mark some of the runs while ACC was troubleshooting problems with the injector.
  • Shift Crew reported: Need to fill the alcohol bubblers.

Plan

  • Continue with Full target production.

Friday, November 4

Past 24 hours

  • Emptied the target at 9 am. No problems on that
  • Started running Empty target production whenever we had beam. (No beam for ~4.5 hours for a NL access)

Shift Summary

Issues/Reports

Hard reboot worked (Arshak)

Plan

  • Continue with empty target production.
  • (Note): Hall B plans to change to a 1/2 wave plate at some point Today.
  • After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)

Thursday, November 3

Past 24 hours

  • Maintenance day. Got Beam Back in the Swing shift.
  • Harp scans after beam returned. [1] [2]
  • Full target production all night whenever we had beam.
  • Beam has been unstable. Related to issue to reduce HALO counts above 4nA for Hall B.

Shift Summary

Issues/Reports

Plan

  • 9:30 am Empty target, then start production
  • After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)