Difference between revisions of "Run Planning Meeting Noters, November 2- November 9, 2022"

From GlueXWiki
Jump to: navigation, search
(Monday, November 7)
Line 11: Line 11:
 
=Monday, November 7=
 
=Monday, November 7=
 
=== Past 72 hours ===
 
=== Past 72 hours ===
* Friday. We took production data in empty target all day until Saturday morning
+
* Friday. We took production data in empty target all day until Saturday morning. Smooth beam
* Saturday Day: Total accumulated events for the empty target ~2.5B  
+
* Saturday: ( in general the beam conditions have not been ideal)
**  
+
**  Total accumulated events for all this days doing empty target ~2.5B  
 +
**   Day: ~10 am we started filling the target while Sasha
 
* Started running Empty target production whenever we had beam. (No beam for ~4.5 hours for a NL access)
 
* Started running Empty target production whenever we had beam. (No beam for ~4.5 hours for a NL access)
  
 
=== Shift Summary ===
 
=== Shift Summary ===
* [https://logbooks.jlab.org/entry/4075781 Day Nov 3 (Igal)]
+
* [https://logbooks.jlab.org/entry/4076528 Day Nov 4 ]
* [https://logbooks.jlab.org/entry/4075858 Day Nov 3 (Beni)]
+
* [https://logbooks.jlab.org/entry/4076760 Swing Nov 4]
* [https://logbooks.jlab.org/entry/4076028 Swing Nov 3]
+
* [https://logbooks.jlab.org/entry/4076892 Owl Nov4/5]
* [https://logbooks.jlab.org/entry/4076311 Owl Nov3/4]
+
* [https://logbooks.jlab.org/entry/4076991 Early riser Nov 5]
* [https://logbooks.jlab.org/entry/4076405 Early riser Nov 4]
+
* [https://logbooks.jlab.org/entry/4077095 Day Nov 5 ]
 +
* [https://logbooks.jlab.org/entry/4077240 Swing Nov 5]
 +
* [https://logbooks.jlab.org/entry/4077403 Owl Nov5/6 (Luckiest Shift crew of the year!)]
 +
* [https://logbooks.jlab.org/entry/4077533 Early riser Nov 6]
 +
* [https://logbooks.jlab.org/entry/4077654 Day Nov 6 ]
 +
* [https://logbooks.jlab.org/entry/4077771 Swing Nov 6]
 +
* [https://logbooks.jlab.org/entry/4077881 Owl Nov6/7]
 +
* [https://logbooks.jlab.org/entry/4077974 Early riser Nov 7]
  
=== Issues/Reports ===
 
* [https://logbooks.jlab.org/entry/4076018 Alarm in one of the magnets ] (Beni)
 
[https://logbooks.jlab.org/entry/4076021 Cycling TAG5C] (Daniel Moser)
 
* [https://logbooks.jlab.org/entry/4076377 CDC EPICS showing diconnected] (Arshak/Boris)
 
[https://logbooks.jlab.org/entry/4076382 Hard reboot worked] (Arshak)
 
  
 +
=== Issues/Reports ===
 +
* Shift Crew repotred:  Fill the alcohol bubblers
 +
 
=== Plan ===
 
=== Plan ===
  
* Continue with empty target production.  
+
* Continue with Full target production.  
* (Note): Hall B plans to change to a 1/2 wave plate at some point Today.
+
 
 
* After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
 
* After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
  

Revision as of 08:31, 7 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Monday, November 7

Past 72 hours

  • Friday. We took production data in empty target all day until Saturday morning. Smooth beam
  • Saturday: ( in general the beam conditions have not been ideal)
    • Total accumulated events for all this days doing empty target ~2.5B
    • Day: ~10 am we started filling the target while Sasha
  • Started running Empty target production whenever we had beam. (No beam for ~4.5 hours for a NL access)

Shift Summary


Issues/Reports

  • Shift Crew repotred: Fill the alcohol bubblers

Plan

  • Continue with Full target production.
  • After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)

Friday, November 4

Past 24 hours

  • Emptied the target at 9 am. No problems on that
  • Started running Empty target production whenever we had beam. (No beam for ~4.5 hours for a NL access)

Shift Summary

Issues/Reports

Cycling TAG5C (Daniel Moser)
Hard reboot worked (Arshak)

Plan

  • Continue with empty target production.
  • (Note): Hall B plans to change to a 1/2 wave plate at some point Today.
  • After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)

Thursday, November 3

Past 24 hours

  • Maintenance day. Got Beam Back in the Swing shift.
  • Harp scans after beam returned. [1] [2]
  • Full target production all night whenever we had beam.
  • Beam has been unstable. Related to issue to reduce HALO counts above 4nA for Hall B.

Shift Summary

Issues/Reports

Plan

  • 9:30 am Empty target, then start production
  • After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)