Difference between revisions of "Run Planning Meeting Noters, November 2- November 9, 2022"

From GlueXWiki
Jump to: navigation, search
(Past 24 hours)
(Issues/Reports)
Line 24: Line 24:
 
* [https://logbooks.jlab.org/entry/4076018 Alarm in one of the magnets ] (Beni)
 
* [https://logbooks.jlab.org/entry/4076018 Alarm in one of the magnets ] (Beni)
 
  [https://logbooks.jlab.org/entry/4076021 Cycling TAG5C] (Daniel Moser)
 
  [https://logbooks.jlab.org/entry/4076021 Cycling TAG5C] (Daniel Moser)
* [https://logbooks.jlab.org/entry/4076377 CDC EPICS showing diconected] (Arshak/Boris)
+
* [https://logbooks.jlab.org/entry/4076377 CDC EPICS showing diconnected] (Arshak/Boris)
 
  [https://logbooks.jlab.org/entry/4076382 Hard reboot worked] (Arshak)
 
  [https://logbooks.jlab.org/entry/4076382 Hard reboot worked] (Arshak)
  

Revision as of 08:31, 4 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Friday, November 4

Past 24 hours

  • Emptied the target at 9 am. No problems on that
  • Started running Empty target production whenever we had beam. (No beam for ~4.5 hours for a NL access)

Shift Summary

Issues/Reports

Cycling TAG5C (Daniel Moser)
Hard reboot worked (Arshak)

Plan

  • Empty target production
  • After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)


Thursday, November 3

Past 24 hours

  • Maintenance day. Got Beam Back in the Swing shift.
  • Harp scans after beam returned. [1] [2]
  • Full target production all night whenever we had beam.
  • Beam has been unstable. Related to issue to reduce HALO counts above 4nA for Hall B.

Shift Summary

Issues/Reports

Plan

  • 9:30 am Empty target, then start production
  • After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)