Difference between revisions of "Run Planning Meeting Noters, November 2- November 9, 2022"
From GlueXWiki
(→Past 24 hours) |
|||
Line 11: | Line 11: | ||
=Friday, November 4= | =Friday, November 4= | ||
=== Past 24 hours === | === Past 24 hours === | ||
− | * Emptied the target at 9 am. | + | * Emptied the target at 9 am. No problems on that |
− | * Started running Empty target production whenever we had beam | + | * Started running Empty target production whenever we had beam. (No beam for ~4.5 hours for a NL access) |
=== Shift Summary === | === Shift Summary === |
Revision as of 08:29, 4 November 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Contents
Friday, November 4
Past 24 hours
- Emptied the target at 9 am. No problems on that
- Started running Empty target production whenever we had beam. (No beam for ~4.5 hours for a NL access)
Shift Summary
Issues/Reports
- Alarm in one of the magnets (Beni)
Cycling TAG5C (Daniel Moser)
- CDC EPICS showing diconected (Arshak/Boris)
Hard reboot worked (Arshak)
Plan
- Empty target production
- After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
Thursday, November 3
Past 24 hours
- Maintenance day. Got Beam Back in the Swing shift.
- Harp scans after beam returned. [1] [2]
- Full target production all night whenever we had beam.
- Beam has been unstable. Related to issue to reduce HALO counts above 4nA for Hall B.
Shift Summary
Issues/Reports
- FCAL voltage issue and bases replacement (Malte)
- Simon was not authorized to add logbook entries when logged into the logbook on gluon02 (??)
Plan
- 9:30 am Empty target, then start production
- After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)