=Wednesday, November 3=
+
=Friday, November 4=
 +
=== Past 24 hours ===
 +
* Emptied the target at 9 am.
 +
* Started running Empty target production whenever we had beam
 +
 
 +
=== Shift Summary ===
 +
* [https://logbooks.jlab.org/entry/4075781 Day Nov 3 (Igal)]
 +
* [https://logbooks.jlab.org/entry/4075858 Day Nov 3 (Beni)]
 +
* [https://logbooks.jlab.org/entry/4076028 Swing Nov 3]
 +
* [https://logbooks.jlab.org/entry/4076311 Owl Nov3/4]
 +
* [https://logbooks.jlab.org/entry/4076405 Early riser Nov 4]
 +
 
 +
=== Issues/Reports ===
 +
* [https://logbooks.jlab.org/entry/4076018 Alarm in one of the magnets ] (Beni)
 +
[https://logbooks.jlab.org/entry/4076021 Cycling TAG5C] (Daniel Moser)
 +
* [https://logbooks.jlab.org/entry/4076377 CDC EPICS showing diconected] (Arshak/Boris)
 +
[https://logbooks.jlab.org/entry/4076382 Hard reboot worked] (Arshak)
 +
 
 +
=== Plan ===
 +
 
 +
* Empty target production
 +
* After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
 +
 
 +
 
 +
=Thursday, November 3=
 
=== Past 24 hours ===
 
=== Past 24 hours ===
 
* Maintenance day. Got Beam Back in the Swing shift.
 
* Maintenance day. Got Beam Back in the Swing shift.

Revision as of 07:08, 4 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Friday, November 4

Past 24 hours

  • Emptied the target at 9 am.
  • Started running Empty target production whenever we had beam

Shift Summary

Issues/Reports

Cycling TAG5C (Daniel Moser)
Hard reboot worked (Arshak)

Plan

  • Empty target production
  • After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)


Thursday, November 3

Past 24 hours

  • Maintenance day. Got Beam Back in the Swing shift.
  • Harp scans after beam returned. [1] [2]
  • Full target production all night whenever we had beam.
  • Beam has been unstable. Related to issue to reduce HALO counts above 4nA for Hall B.

Shift Summary

Issues/Reports

Plan

  • 9:30 am Empty target, then start production
  • After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)