Difference between revisions of "Run Planning Meeting Noters, November 2- November 9, 2022"
From GlueXWiki
(→Issues/Reports) |
|||
Line 9: | Line 9: | ||
Back to [[Run Coordination Meetings:Fall2022]] | Back to [[Run Coordination Meetings:Fall2022]] | ||
− | = | + | =Friday, November 4= |
+ | === Past 24 hours === | ||
+ | * Emptied the target at 9 am. | ||
+ | * Started running Empty target production whenever we had beam | ||
+ | |||
+ | === Shift Summary === | ||
+ | * [https://logbooks.jlab.org/entry/4075781 Day Nov 3 (Igal)] | ||
+ | * [https://logbooks.jlab.org/entry/4075858 Day Nov 3 (Beni)] | ||
+ | * [https://logbooks.jlab.org/entry/4076028 Swing Nov 3] | ||
+ | * [https://logbooks.jlab.org/entry/4076311 Owl Nov3/4] | ||
+ | * [https://logbooks.jlab.org/entry/4076405 Early riser Nov 4] | ||
+ | |||
+ | === Issues/Reports === | ||
+ | * [https://logbooks.jlab.org/entry/4076018 Alarm in one of the magnets ] (Beni) | ||
+ | [https://logbooks.jlab.org/entry/4076021 Cycling TAG5C] (Daniel Moser) | ||
+ | * [https://logbooks.jlab.org/entry/4076377 CDC EPICS showing diconected] (Arshak/Boris) | ||
+ | [https://logbooks.jlab.org/entry/4076382 Hard reboot worked] (Arshak) | ||
+ | |||
+ | === Plan === | ||
+ | |||
+ | * Empty target production | ||
+ | * After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha) | ||
+ | |||
+ | |||
+ | =Thursday, November 3= | ||
=== Past 24 hours === | === Past 24 hours === | ||
* Maintenance day. Got Beam Back in the Swing shift. | * Maintenance day. Got Beam Back in the Swing shift. |
Revision as of 07:08, 4 November 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Contents
Friday, November 4
Past 24 hours
- Emptied the target at 9 am.
- Started running Empty target production whenever we had beam
Shift Summary
Issues/Reports
- Alarm in one of the magnets (Beni)
Cycling TAG5C (Daniel Moser)
- CDC EPICS showing diconected (Arshak/Boris)
Hard reboot worked (Arshak)
Plan
- Empty target production
- After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
Thursday, November 3
Past 24 hours
- Maintenance day. Got Beam Back in the Swing shift.
- Harp scans after beam returned. [1] [2]
- Full target production all night whenever we had beam.
- Beam has been unstable. Related to issue to reduce HALO counts above 4nA for Hall B.
Shift Summary
Issues/Reports
- FCAL voltage issue and bases replacement (Malte)
- Simon was not authorized to add logbook entries when logged into the logbook on gluon02 (??)
Plan
- 9:30 am Empty target, then start production
- After empty production completed: calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)